Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Dispatching method controlled from base station for enhancing up going dedicated channel in mobile communication system

A mobile communication system and dedicated channel technology, which is applied to the scheduling field of base station control with enhanced uplink dedicated channel in mobile communication systems, can solve problems such as incomplete application of TDD systems, alleviate the problem of limited uplink codewords, and increase services. Covering and improving the effect of uplink cell throughput

Inactive Publication Date: 2005-06-15
BEIJING SAMSUNG TELECOM R&D CENT +1
View PDF0 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0017] From the above analysis, it can be seen that the time and rate scheduling scheme controlled by the base station (Node B) for the FDD system is not fully applicable to the TDD system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dispatching method controlled from base station for enhancing up going dedicated channel in mobile communication system
  • Dispatching method controlled from base station for enhancing up going dedicated channel in mobile communication system
  • Dispatching method controlled from base station for enhancing up going dedicated channel in mobile communication system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0088] The present invention proposes a scheduling method applicable to the enhanced base station (Node B) control of the uplink dedicated channel (DCH) in a TDD CDMA mobile communication system. The transmission of the (DCH) is controlled, and the scheduling of the DCH transmission of the UE in the cell is implemented. In order to facilitate the understanding of the present invention, an embodiment of the Node B scheduling process in a low code rate TDD (LCR-TDD) system is provided below, and its schematic diagram is as follows Figure 6 shown.

[0089] Assume that in the LCR-TDD system, N is set in the current cell usc = 4 pairs of shared control channels (EU-SICH / EU-SCCH), and there are N u = 11 uplink enhanced users who are transmitting services. Since there are only 4 pairs of shared control channels in the cell, only 4 UEs can send scheduling information at most in each subframe. Then, to transmit the scheduling information of all uplink enhanced users, at least the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The disclosed method includes steps: Node B broadcasts information of shared channels through broadcast channel; Node B sets up time interval of reporting dispatch information; Node B transfers serial number of shared channels through down going DPCH of UE in sequence to selected UE; after receiving serial number of shared channels, UE sends dispatch information through up going enhanced shared channel; after receiving dispatch information of all UE, Node B determines UE to be dispatched and assignation information for dispatch; the said assignation information for dispatch through EU-SCCH related to EU-SICH is sent to UE needed to dispatch. Using signaling in physical layer combines transmission format of DCH transmission of UE in subzone, the invention controls transmission time, time slot and transmission codes so as to realize quick dispatching for DCH transmission of UE in subzone.

Description

technical field [0001] The present invention relates to a scheduling method with uplink enhanced base station (Node B) control in a Time Division Duplex Code Division Multiple Access (TDD CDMA for short) mobile communication system, specifically, Node B utilizes physical layer signaling to user equipment ( The transmission rate, transmission time, transmission time slot and transmission codeword of the dedicated channel (DCH) of the UE are controlled, so as to realize the scheduling of the DCH transmission of the UE in the cell by the Node B. Background technique [0002] The 3rd Generation Partnership Project (abbreviated as 3GPP) is a technical standardization organization implementing the 3rd generation mobile communication system, wherein the 3rd generation mobile communication technology standard includes Frequency Division Duplex (FDD) and Time Division Duplex (TDD) modes. Since its establishment, 3GPP has announced in October 1999 the third-generation mobile communica...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04L1/00H04B7/005H04W72/12
Inventor 孙程君王平李玄又朴成日李惠英金秉润金成训郑扩勇
Owner BEIJING SAMSUNG TELECOM R&D CENT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products