Combined grouting construction process of reinforcing foundation
A composite grouting and construction method technology, which is applied in basic structure engineering, soil protection, construction, etc., can solve the problems of easy loss of grout, large shrinkage of consolidated body, poor grouting effect, etc. The effect of large range and increased strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0040] 1. Project overview
[0041] The factory building of Shengcheng Leather Factory in Qingxi Town, Dongguan City is a double equal-span five-story frame structure with a construction area of about 6,000 square meters. The project started construction in early 1993 and was completed at the end of the same year. Within one year after the completion of the project, it was found that the masonry of the brick wall was severely cracked, there were serious figure-eight cracks at the window corners of the outer wall, horizontal cracks appeared on the top of the window on the second floor, and the brick wall of the lower floor under the top beam of the toilet was detached. ①-②-B-C axis Severe longitudinal and transverse cracks appeared in the filling wall, so the project has not been delivered. Entrusted by the factory, the applicant used composite grouting to reinforce the foundation foundation of the factory building.
[0042] 2. The implementation of composite grouting reinf...
Embodiment 2
[0050] 1. Project overview:
[0051] The general factory building (B) of Shunde Sanzhou Real Estate Company is a four-story cast-in-place reinforced concrete frame structure, with a building height of 16.5m and a building area of 19280m2; area; set up three settlement joints. The project started on May 28, 1993 and was completed on May 23, 1994. In 1997, cracks appeared in the beams, slabs, columns, and outer walls of the factory building. From June to July 1997, the General Station of Quality and Safety Supervision and Inspection of Construction Projects of Guangdong Province appraised the quality of the factory building and submitted the "About the General Factory Building of Shunde Sanzhou Real Estate Company (B ) Technical Appraisal Opinions on Engineering Quality, the appraisal conclusion is: the reliability level of the plant is level four, that is, the reliability seriously does not meet the requirements of the current national standards and regulations, and it can n...
Embodiment 3
[0064] 1. Project overview
[0065] Agile Garden Buildings F19, F20, F21, F22, F23, F25, and F26 built by Zhongshan Agile Real Estate Corporation are located in Sanxiang Town, Zhongshan City. The foundations are drilled and punched cast-in-situ pile foundations, with pile diameters of 800mm, 1000mm and There are two kinds of 1200mm, the pile end is supported on slightly weathered granite, and the allowable bearing capacity of the designed single pile is 2200kN, 3500kN and 5000kN. After the pile foundation construction was completed, the Zhongshan Construction Engineering Quality Inspection Center inspected the pile foundation. All 238 engineering piles were tested by P.I.T. The test results are as follows: a total of 108 piles have weak soil layers or excessively thick sediment at the bottom of the piles, and the bottom of the piles has not reached the design bearing layer, and reinforcement treatment is required.
[0066] 2. The implementation of composite grouting reinforce...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com