Pipe pile construction method

A construction method and technology of tubular piles, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of weakening the bearing capacity of pile ends, etc., and achieve the effect of improving the bearing capacity of pile foundations, improving construction efficiency, and improving the supporting effect

Inactive Publication Date: 2006-03-15
北京中技天昊工程技术有限公司
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0014] The present invention provides a construction method for pipe piles, which solves the technical problem of weakening the bearing capacity of the pile ends due to penetration after the original sealed pile shoes compact the soil at the pile ends and removes bad soil quality; The problem that the soil plug in the pipe pile is squeezed and slipped again under the load after the pile is completed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pipe pile construction method
  • Pipe pile construction method
  • Pipe pile construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0058] Embodiment: The pipe pile construction technique is as shown in Figure 1:

[0059] Step (1): Install a pile end bearing capacity enhancer at the anchor point of the pile foundation;

[0060] Step (2): The pile driver is in place, so that the pile ends of the pipe piles are aligned with the pile shoes, and the verticality is ensured;

[0061] Step (3): Sink the pile by static pressure, hammering, etc., according to the design requirements, connect the pile or not connect the pile, and suspend the pile sinking when the pipe pile passes through the bad soil layer or enters the bearing layer at the pile end; pile sinking When the spud shoe squeezes the brace steel plate, the lower end of the brace steel plate expands to the surroundings, relying on the top cap, the pile end steel plate and the pipe pile wall to bear the transmitted pressure.

[0062] Step (4): Take out the pile end bearing capacity enhancer from the pipe pile, first pull the rope from the top of the pile t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention is a tubular pile constructing method and pile-end bearing capacity enhancer, placing the enhancer at positioning point of the picket base; the pile machine takes its place to align the end of the pile end with the enhancer; starting sinking the pile, and when the pile passes through bad earth layer or enters in pile-end force-bearing layer, temporarily stopping stinking pile; pulling the rope to drive axial umbrella rod, so that the top cap relieves the inclined support from restriction, the fixed stop block drives the annular slide block to make the supporting link rod push and spread the inclined support around so as to shrink into the pile, and the active stop block drives the pile boot to take out the enhancer; sinking the pile to the designed depth and the pile end squeezes compact earth to gush into the pile to form an earth stopper; pouring concrete in the pile to form an earth stopper cap, thus forming a pile. It can enhance the penetrating property of the pile, extrude pile end earth closely, heighten pile-end bearing capacity, reduce deposition quantity, heighten pile forming quality and constructing efficiency, etc

Description

technical field [0001] The invention relates to a construction method for building foundation piles, in particular to a construction technique for pipe piles. Background technique [0002] At present, the construction methods of pipe piles are divided into static pressure pile sinking method and hammer pile sinking method. The static pressure pile sinking method uses the static pressure reaction force to press the pipe pile into the rock and soil layer, while the hammer pile sinking method relies on a strong impact force to impact the top of the pipe pile to penetrate the pipe pile into the soil layer. Their construction process is: measurement and positioning, pile driver installation in place, pile lifting in place and centering, two-phase orthogonal direction straightening, static pressure or hammering method to sink the first section of piles, lifting the second section of piles Align the position, connect the piles by welding or sulfur cement, and sink the second secti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/30E02D5/72
Inventor 黄强王建军颜小荣魏巍
Owner 北京中技天昊工程技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products