Reservoir ecological desilting scheme decision-making method based on multi-target constraint
A decision-making method and multi-objective technology, applied in the decision-making field of reservoir ecological dredging scheme based on multi-objective constraints, can solve the problems of difficult decision-making process and complex decision-making, and achieve the effect of tipping efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0065] The specific embodiments of the present invention will be further described in detail below with reference to the examples.
[0066] 1) Analyze the current situation and trend of siltation in the reservoir, count the ecologically sensitive areas in the reservoir area, and determine the scope of dredging.
[0067] Tongjiezi Hydropower Station is located in Sichuan Province, China, downstream of Dadu River, 80km away from Leshan City. It is a solid gravity overflow dam with a maximum dam height of 82m and a total storage capacity of 200 million m2. 3 . The project started in 1985, the first unit generated electricity in December 1992, and was completed in December 1994. According to the analysis of the measured underwater topography, since the water storage of Tongjiezi Reservoir has been used for more than 20 years, the development of sediment deposition has been rapid. 3 Among them, the storage capacity loss below the normal water level exceeds 50%, and the storage ca...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com