Working condition monitoring and control model building method and application method and device thereof
A technology of model building and working conditions, applied in the field of managed pressure drilling, can solve labor and other problems, achieve the effects of reducing costs, being widely applicable, and improving efficiency and accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0135] Embodiment 1 of the present invention provides a method for establishing a working condition monitoring model, the process of which is as follows figure 1 shown, including the following steps:
[0136] Step S101: Generate a sample set from the multiple sets of working-condition drilling data obtained, and extract multiple sets of working-condition drilling data from the sample set as a training set.
[0137] In some optional embodiments, multiple sets of working condition drilling data obtained at different times or different time periods are used to generate a sample set, and each sample data in the sample set contains information related to the time or time period Corresponding vertical pressure, back pressure, outlet flow, flow difference and working condition labels. Among them, different working conditions refer to working conditions such as normal drilling, drilling shutdown, overflow and leakage. When the formation pressure is greater than the bottom hole press...
Embodiment 2
[0214] Embodiment 2 of the present invention provides a working condition monitoring method, the process of which is as follows Figure 10 shown, including the following steps:
[0215] Step S201: Obtain the standing pressure, back pressure, outlet flow and flow difference corresponding to the moment or time period of the working condition to be tested, and generate data of the working condition to be tested. The vertical pressure, back pressure, outlet flow and flow difference in the working condition data to be measured can be obtained by referring to the method of obtaining the drilling data in the working condition, and the specific method has been introduced in the first embodiment. Among them, the flow rate of the bottom hole drill bit is calculated through the perception algorithm, and then the flow rate difference is obtained, which is convenient for obtaining flow rate difference data in wells that do not have corresponding measurement conditions, reduces the cost of ...
Embodiment 3
[0260] Embodiment 3 of the present invention provides a method for establishing a working condition control model, the process of which is as follows Figure 11 shown, including the following steps:
[0261] Step S301: Accumulate multiple groups of state-action data related to drilling conditions in the playback buffer of the deep Q network DQN model.
[0262] Abnormal working conditions refer to working conditions other than normal working conditions, such as overflow, leakage and other working conditions. When the formation pressure is greater than the bottom hole pressure, overflow will occur. Overflow is the process that the gas and liquid in the formation invade the annulus of the wellbore. Overflow includes gas invasion or liquid invasion; gas invasion is gas intrusion, which is a kind of overflow, and the overflow fluid can be gas or liquid. Losses occur when formation pressure is less than bottomhole pressure. The bottom hole pressure can be controlled by changing t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com