Comprehensive pipeline space-time analysis and risk estimation method based on 4D-BIM technology

A 4D-BIM, integrated pipeline technology, applied in the field of building information model information, can solve the problems of inability to display collision situations in the form of animation, inability to estimate and solve time, and inability to batch edit time dimension information, etc., to improve the efficiency of construction organization , Reduce the difficulty of construction, and create the effect quickly

Pending Publication Date: 2022-04-29
SOUTHEAST UNIV
View PDF2 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to address the shortcomings of the above-mentioned background technology and provide a comprehensive pipeline space-time analysis and risk estimation method based on 4D-BIM technology. The mapping relationship of the code correlates the construction schedule and the 3D model to obtain a 4D model that integrates time information and space information. By estimating the possible space-time risk...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Comprehensive pipeline space-time analysis and risk estimation method based on 4D-BIM technology
  • Comprehensive pipeline space-time analysis and risk estimation method based on 4D-BIM technology
  • Comprehensive pipeline space-time analysis and risk estimation method based on 4D-BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The present invention will be further specifically described below in conjunction with the accompanying drawings and specific embodiments, and the advantages of the above and / or other aspects of the present invention will become clearer, but this should not be interpreted as that the protection scope of the present invention is limited to the following All technical solutions realized based on the content of the present invention fall within the scope of protection of the present invention.

[0032]The method of the present invention based on 4D-BIM technology for comprehensive pipeline spatio-temporal analysis and risk estimation is as follows: figure 1 As shown, it includes the following 5 steps.

[0033] Step 1. According to the construction drawings, generate a three-dimensional model of the comprehensive pipeline in Microstation software, and assign a code to each component; the three-dimensional model created in this embodiment includes the current pipeline model,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an integrated pipeline space-time analysis and risk estimation method based on a 4D-BIM technology, and belongs to the technical field of calculation, reckoning or counting. Generating a comprehensive pipeline three-dimensional model in Microstation software according to a construction drawing, and endowing each component with a code; the method comprises the following steps: converting a three-dimensional model of the comprehensive pipeline into a. Dgn.spx format which can be identified by Synchro software by using a plug-in SynchroPlug in the Microstation software; the method comprises the following steps: exporting coding information of a three-dimensional model in Microstation software, and importing the coding information into Project software; in Project software, according to the coding information and the construction organization scheme, a construction progress schedule is formulated and converted into a. Xml format; and importing the three-dimensional model and the construction progress schedule into Synchro software, simulating the construction progress and carrying out space-time analysis and risk estimation, if no potential risk exists, determining the final comprehensive pipeline construction organization scheme, otherwise, circulating the optimization steps until the requirements are met. According to the invention, possible problems and time-space risks in the construction process are predicted, and the construction management efficiency and the construction safety are effectively improved.

Description

technical field [0001] The invention relates to building information model information technology, specifically discloses a comprehensive pipeline space-time analysis and risk estimation method based on 4D-BIM technology, and belongs to the technical field of calculation, calculation or counting. Background technique [0002] Building Information Modeling (Building Information Modeling, BIM) can carry all kinds of information in the construction process. In order to simulate the space usage in the actual construction process, 3D modeling of integrated pipelines can be carried out to analyze the conflict of work space in the construction process. Good conditions have been created. Chinese patent CN110889160A discloses a municipal pipeline construction method based on BIM technology, which uses BIM technology to establish BIM models of various professional pipelines, and conducts collision detection on the pipeline BIM models to reflect the spatial position and collision degre...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q10/10G06Q10/04G06F30/20G06F30/13G06T17/00G06Q50/08
CPCG06Q10/06312G06Q10/109G06Q10/0635G06Q10/04G06F30/20G06F30/13G06T17/00G06Q50/08
Inventor 罗桑严紫薇王耀正
Owner SOUTHEAST UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products