Large-scale construction project investment management and control method and system
A construction project and management and control system technology, applied in the field of investment management and control of large-scale construction projects, can solve problems such as low efficiency of project investment management and control, achieve the effects of improving work efficiency and investment risk prevention and control capabilities, solving personnel interference factors, and reducing workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] This embodiment is an embodiment of a large-scale construction project investment management and control method and system.
[0028] see Figure 1-3 , a large-scale construction project investment management and control method and system, comprising an investment plan calculation model, an investment plan duration model and project management process data, the investment plan calculation model includes an investment plan calculation formula, and the investment plan duration model includes an estimated structure, Network plan, estimated completion period, remaining construction period and approximate completion ratio. The project management process data includes preparation data management data, budget estimate management data, contract management data, financial management data, main basic data of investment management calculation model and output investment plan manage data.
[0029] Through the above-mentioned technical solution, the construction period model is an i...
Embodiment 2
[0037] This embodiment is an embodiment of a large-scale construction project investment management and control method and a system management and control method.
[0038] A management and control method for a large-scale construction project investment management and control system, including a project investment management and control method, and the project investment management and control method includes the following steps:
[0039] S1: Obtain the mapping relationship between the estimated cost structure of the project and the construction network plan of the project, and obtain the estimated construction period of each sub-item of the project and the overall estimated construction period of the project. Please refer to figure 1 ;
[0040]S2: Obtain the expected completion period, project duration, estimated duration, contract duration and contract estimated duration, store them in the storage module, use the calculation engine, and use the investment plan duration model...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com