In-water old bridge cover beam demolition platform erecting method
A platform and cover beam technology, which is applied in the field of dismantling and erecting platforms of old bridge cover beams in water, can solve the problems of affecting the construction progress, high risk, and difficult construction, etc., and achieve the effect of rapid erection and safe erection process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Such as figure 1 As shown, a platform for dismantling old bridge girders in water and a method for erecting the same, and a method for dismantling platforms for old bridge girders in water include the following steps:
[0035] S1: Set up the support of the tie beam 3: install several widening beams 4 on the tie beam 3, bind and fix each widening beam 4 and the tie beam 3, set all the widening beams 4 along the longitudinal direction of the bridge, and extend at least two ends of the widening beam 4 beyond the cover Beam 1 Width.
[0036] Specifically, the widening beams 4 are I-beams, arranged longitudinally along the bridge, and multiple widening beams 4 are arranged in parallel at equal intervals, widening the width and area of the top of the tie beams 3 that can be used for support.
[0037] S2: Build platform main girder 5: install main girder 5 on widening girder 4, set main girder 5 along the transverse direction of the bridge, and extend at least two ends of m...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com