Intelligent engineering supervision system and supervision method based on image acquisition system
An image acquisition and engineering technology, applied in image data processing, data processing applications, instruments, etc., can solve the problems of difficult supervision, untimely progress update, affecting the efficiency of the engineering process, etc., to improve fluency and facilitate supervision and control. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0041] Example: such as Figure 1 to Figure 5 As shown, the present invention provides a kind of intelligent engineering supervision system based on image acquisition system, comprising:
[0042] An acquisition module, the acquisition module is used for real-time acquisition of the construction status of the project site, and wirelessly transmits the acquisition data to the central processing unit;
[0043] A data processing module, the data processing module is used to process the project construction plan data, establish the engineering model and progress, and receive the collected data transferred by the central processor, process the collected data, and synchronize the processed data on the engineering model;
[0044] A data analysis module, the data analysis module is used to carry out comparative analysis in combination with the engineering model and the project site data collected by implementation, determine whether the construction progress and quality of the project...
Embodiment example
[0050] In a preferred implementation case, the picture collection unit and the image collection unit include camera equipment fixed on the road surface and unmanned aerial vehicle equipment used for aerial photography, and the picture collection unit and the image collection unit receive instructions from the central processing unit through the communication unit. For data collection, when the collection instruction is greater than t, the image collection unit is triggered to collect video; when the collection instruction is less than or equal to t, the image collection unit is triggered to collect images, and t is 2s.
[0051] In a preferred implementation case, the data processing module includes engineering model establishment, engineering plan formulation, data collection processing and data synchronization processing, wherein,
[0052] The construction of the engineering model is based on BIM to establish a three-dimensional simulation model of the project to be constructe...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com