Construction method of karst cave pile foundation
A construction method and karst cave technology, which is applied in the direction of earthwork drilling, filling, safety devices, etc., can solve the problems of grouting of poured concrete, difficulty in implementation, and secondary hole collapse, so as to speed up the construction progress, improve the effect, and expand the scope Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0030] Such as Figure 1~3 As shown, the invention discloses a construction method of karst cave pile foundation, which can be applied to half-filled small and medium-sized karst caves (below 3m in height) and fully-filled karst caves (full-filled karst caves are not limited by the size of karst cave 2); specifically , the method includes the following steps:
[0031] Step S1: measure and set out to determine the pile position; specifically, use GPS to releas...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com