Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Management method and platform for dock erection workflow, equipment and storage medium

A technology of work flow and management method, which is applied in the field of dock construction, can solve the problems of increasing erection costs, inability to guide, and affecting erection efficiency, and achieve the effects of reducing cost investment, realizing effective management, and improving erection efficiency

Pending Publication Date: 2021-08-03
GUANGZHOU SHIPYARD INTERNATIONAL LTD
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the traditional scaffolding is designed by the construction method institute to design the schematic diagram of scaffold erection and erection nodes, which are only qualitative. Most construction workers carry out on-site erection operations based on personal experience. The scaffolding erection workflow management function is lacking, and the work objectives are not clear. The design and the use of materials are instructive, which affects the efficiency of erection and increases the cost of erection

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Management method and platform for dock erection workflow, equipment and storage medium
  • Management method and platform for dock erection workflow, equipment and storage medium
  • Management method and platform for dock erection workflow, equipment and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0026] figure 1 It is a flow chart of a management method for a dock erection workflow provided by Embodiment 1 of the present application, and the method is applicable to information management of the dock erection workflow. The method can be executed by the management platform of the dock erection workflow, the platform can be realized by hardware and / or software, and generally integrated in computer equipment. Such as figure 1 As shown, the method specifically includes the following steps:

[0027] S110. When there is currently a dock erection project to be erected, obtain the quantitative quota information associated with the erection of the pending erection project, and the quantitative quota information is predetermined by the historical erection information output from the historical dock erection and publish.

[0028] It should be noted that modern large-scale ship construction adopts modular production. First, the whole ship is divided into several sections (ie mod...

Embodiment 2

[0085] image 3 It is a structural block diagram of a dock erection workflow management platform provided in Embodiment 2 of the present application, and the device is suitable for information management of the dock erection workflow. The means can be realized by hardware and / or software, and generally integrated in computer equipment. Such as image 3 As shown, the device includes: a first acquisition module 210 , a second acquisition module 220 , an information processing module 230 and a third acquisition module 240 .

[0086] The first acquisition module 210 is used to obtain the quantitative quota information associated with the erection in the project to be erected when there is currently a dock erection project to be erected, and the quantitative quota information is output through the historical dock erection. Historical scaffolding information is pre-determined and published;

[0087] The second obtaining module 220 is used to obtain the cost control information of...

Embodiment 3

[0117] Figure 4 A schematic structural diagram of a computer device provided in Embodiment 3 of the present application, such as Figure 4 As shown, the device includes a processor 310, a memory 320, an input device 330, and an output device 340; the number of processors 310 in the device may be one or more, Figure 4 Take one processor 310 as an example; the processor 310, memory 320, input device 330 and output device 340 in the device can be connected by bus or other methods, Figure 4 Take connection via bus as an example.

[0118] The memory 320, as a computer-readable storage medium, can be used to store software programs, computer-executable programs and modules, such as the program instructions / modules corresponding to the management method of the dock erection workflow in the embodiment of the present application (for example, the first acquisition module 210, second acquisition module 220, information processing module 230 and third acquisition module 240). The p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a management method and platform for a dock erection workflow, equipment and a storage medium, and the method comprises the steps: obtaining the quantitative and quota information related to erection in a to-be-erected project when the to-be-erected project of dock erection exists at present, pre-determining and publishing the quantitative quota information through historical shelf building information output in historical dock shelf building; obtaining cost management and control information of the project to be erected in the two given design stages, wherein the cost management and control information is obtained and published in advance through a given cost measurement and calculation strategy; according to the quantitative quota information and the cost management and control information, carrying out material quantity statistics on material quantity use of the project to be erected in construction to obtain a statistical result; and according to the method and the device, the object quantity consumption information determined after object quantity analysis is carried out by adopting the statistical result is obtained, and the object quantity consumption information is output as the current frame building information of the to-be-built frame project and is used as historical frame building information for reference of the next frame building project, so that the scaffold building efficiency is improved, and the cost is reduced.

Description

technical field [0001] The embodiments of the present application relate to the technical field of dock construction, and in particular, to a management method, platform, equipment and storage medium for a dock erection workflow. Background technique [0002] Climbing work is a common phenomenon in the dock industry. It is necessary to build a working platform before outfitting, pipe fitting, painting, welding and other operations. Scaffolding is an extremely important composite component for dock construction. The location space is heterogeneous and changeable, and its scaffolding workflow management presents different importance and particularity compared with the construction industry scaffolding. At present, the traditional scaffolding is designed by the construction method institute to design the schematic diagram of scaffold erection and erection nodes, which are only qualitative. Most construction workers carry out on-site erection operations based on personal experie...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q10/08G06Q50/08
CPCG06Q10/103G06Q10/0875G06Q50/08
Inventor 王勇权
Owner GUANGZHOU SHIPYARD INTERNATIONAL LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products