A method for extracting oil and gas products from underground pyrolysis thick and extra-thick oil shale deposits
A technology for oil shale and subterranean heat, which is applied in the fields of mining fluids, earthwork drilling, wellbore/well components, etc. It can solve problems such as high cost of wellbore design and ineffective use of heat in ore layers, so as to save pyrolysis time and energy saving The effect of cementing cost and ensuring efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] When the thickness of the oil shale deposit is 25m and the buried depth is 300m, the specific steps of the method for exploiting oil and gas products from the underground pyrolysis thick oil shale deposit are as follows:
[0041] 1. Drill wells in the target area selected by the oil shale mine. The layout of the wells is "six-meridian-like spider web type". From the inside to the outside, the middle well 1, the middle circle well 2 and the peripheral well 3 are arranged in sequence. There are 13 wells, the well spacing between the middle well 1 and the middle well 2 is 50m, and the well spacing between the middle well 2 and the peripheral well 3 is 30m.
[0042] 2. Lower the well pipes in each drilling hole. The lowering position of the well pipes should be close to the bottom of the oil shale layer 9 to be pyrolyzed. Among them, the middle well 1 uses a double-layer well pipe structure, and heat insulation should be carried out between the double-layer well pipes. trea...
Embodiment 2
[0049] When the thickness of the oil shale deposit 9 is 40m and the buried depth is 400m, the concrete steps of the method for extracting oil and gas products from the underground pyrolysis extra-thick oil shale deposit are as follows:
[0050] 1. Drill wells in the target area selected by the oil shale mine. The layout of the wells is "six-meridian-like spider web type". From the inside to the outside, the middle well 1, the middle circle well 2 and the peripheral well 3 are arranged in sequence. There are 13 wells, the well spacing between the middle well 1 and the middle well 2 is 50m, and the well spacing between the middle well 2 and the peripheral well 3 is 30m.
[0051] 2. Lower well pipes in each drilling hole. The lowering position of the middle well should be close to the bottom of the oil shale layer 9 to be pyrolyzed. figure 2 The shown "double Y" arrangement is lowered to different positions of the oil shale mineral layer 9, wherein half of the number of middle r...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com