Assembled ecological self-drainage runoff base block
A prefabricated, self-draining technology, which is applied in the field of construction waste resource treatment, can solve problems such as structural changes of permeable bricks, affecting the permeability coefficient and compressive strength of permeable bricks, so as to optimize construction, improve rainwater quality and groundwater recharge , the effect of reducing the heat island effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] The embodiment of the application discloses a prefabricated ecological self-drainage runoff base block. refer to figure 2 The prefabricated ecological self-drainage runoff base block includes a brick body 3 with a rectangular cross section. The bottom surface of the brick body 3 is provided with a runoff channel 4 . The runoff channel 4 is set through the bottom surface of the brick body 3 . middle part. The bottom surface of the brick body 3 is also provided with two radius flow channels 5, the two radius flow channels 5 are set through the bottom surface of the brick body 3, and the length direction of the two radius flow channels 5 is parallel to the length direction of the runoff channel 4, The two radial flow channels 5 are respectively located on both sides of the radial flow channel 4 in the length direction, and the two radial flow channels 5 are arranged symmetrically. The radial flow channel 5 and the radial flow channel 5 on the adjacent brick body 3 can b...
Embodiment 2
[0055] refer to image 3 with Image 6 The difference between embodiment 2 and embodiment 1 is that two abutment surfaces 8 and two condensation surfaces are provided on the brick body 3, the two abutment surfaces 8 are adjacently arranged, and the two condensation surfaces are adjacently arranged, Thereby, the ribs 7 on the abutting surface 8 of the brick body 3 and the ribs 7 on the locking surface 9 of the adjacent brick body 3 are facilitated to snap fit.
Embodiment 3
[0057] refer to image 3 with Figure 7 The difference between embodiment 3 and embodiment 1 is that four abutting surfaces 8 are provided on the brick body 3, and four condensation surfaces are provided on adjacent brick bodies 3, thereby forming two different brick bodies 3, Two different brick bodies 3 are clamped and matched with each other.
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com