Frame reinforcing system and method for channel underneath passing high-speed rail pier pile foundation
A technology for waterways and pile foundations, applied to sheet pile walls, shipping equipment, infrastructure engineering, etc., can solve the problems that reinforcement measures have not formed a system, cannot work together, and cannot guarantee the reinforcement effect, so as to reduce pile foundations and the environment. The effect of preventing the erosion of river water and optimizing the deployment of filling and excavation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] Such as figure 1 Shown is the reinforcement plan of the frame reinforcement system of the pier pile foundation of the high-speed railway under the newly opened channel of the present invention. The pier structure includes the high-speed railway pier 1, the pier cap 3 below the pier 1, and the pier pile foundation 2 below the pier cap 3 . figure 1 The pier structures on the left and right sides are shown in the figure. There is a channel foundation pit 21 under the bridge between the pier structures on both sides. The bottom of the channel foundation pit 21 is provided with a channel reinforcement area. fence pile.
[0050] Such as figure 2 , 3 As shown, in this embodiment, three rows of protective piles arranged along the direction of the waterway are adopted, and the protective piles on both sides of the waterway are arranged symmetrically. The enclosure piles include the outer pile 4 on the side span side, the middle pile 5 on the main span side close to the pier...
Embodiment 2
[0056] The frame reinforcement method of the pile foundation of the high-speed railway bridge pier passing under the newly opened waterway of this embodiment, such as Figure 1~6 As shown, the reinforcement method mainly includes foundation reinforcement of the underpass of the channel, reinforcement of pier pile foundation 2, support reinforcement of the underpass of the channel, excavation of foundation pit 21 of the channel under the bridge, paving and reinforcement of the bottom of the river bed, and construction of anti-collision facilities.
[0057] The construction method specifically includes the following steps:
[0058] (1) Base reinforcement in the underpass of the channel
[0059] A total of three rows of retaining piles are arranged on both sides of the bridge pier, and the retaining piles are arranged along the direction of the waterway; that is, the outer piles 4 are located on the side span side, and the middle piles 5 are located on the main span side and clos...
PUM
Property | Measurement | Unit |
---|---|---|
Pile length | aaaaa | aaaaa |
Pile diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap