A kind of multi-stage purification type grass planting ditch special for green sponge and its construction method
A grass-planting ditch, one-level purification technology, applied in chemical instruments and methods, water/sewage multi-stage treatment, filtration treatment, etc., can solve the problems that the grass-planting ditch cannot be purified at the same time, the grass-planting ditch cannot be quickly discharged, and the cost of excessive rainwater is high. The effect of extending the length of surface runoff, quick and easy construction, and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] like figure 1 and figure 2 As shown, the first filtering zone includes a planting soil layer 15 , a sand layer 16 and a zeolite layer 17 sequentially from top to bottom, and the base 112 of the baffle 11 is embedded in the zeolite layer 17 . Rainwater in city roads according to figure 1 The arrow below indicates entering the grass-planting ditch, the water in the seepage part enters the baffle 11 after being filtered by the above three layers, and finally the relatively clean water is removed from the Figure 4 The water collection pipe 22 is shown leading into the city drain.
[0054] Further, in a specific embodiment of the present invention, the second filter area includes a plurality of second filter areas, and different second filter areas have different particle sizes according to the order of the water flow. diameter from thick to thin. Because the water flow has a certain route in the water flow area, the water flow is gradually filtered with the flow of th...
Embodiment 2
[0063] A construction method for a multi-stage purification type grass planting ditch dedicated to green sponges, comprising the following steps:
[0064] Step 1. Dig a trapezoidal ditch with a wide upper and a lower narrow on both sides of the road in the area to be constructed, clear the bottom and tamp it, and set a water collection pipe 22 at the bottom of the ditch close to the outflow area 2;
[0065] Step 2, spread a layer of zeolite on the tamped bottom surface of the trench, then place the base 112 of the baffle plate 11 on the zeolite, and use a water stop tape between the baffle plate 11 and the baffle plate 11 to adhere and form a water flow channel 1, Then, a layer of zeolite is laid on the base 112, so that the base 112 of the baffle 11 is pressed into the zeolite layer 17; a sand layer 16 is laid on the zeolite basis, and the two are separated by a permeable geotextile; the sand layer 16 A planting soil layer 15 is laid on the foundation to plant turf; thus form...
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com