Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Automatic test method and device for temporary speed limit message of train control center

A temporary speed limit and train control center technology, applied in the direction of electrical test/monitoring, test/monitoring control system, general control system, etc., can solve the problems of error-prone testing, time-consuming manual testing, and reduce temporary speed limit messages Test efficiency and other issues to achieve the effect of avoiding heavy workload and improving accuracy and efficiency

Inactive Publication Date: 2020-12-18
卡斯柯信号(北京)有限公司
View PDF5 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the test of the temporary speed limit message sent by the train control center is mainly through manual testing, which requires testers to test one by one according to the test scenario. If the workload of the test is large, negligence may occur, resulting in easy testing. Errors and omissions occur, and manual testing takes a lot of time, which reduces the testing efficiency of temporary speed limit packets

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Automatic test method and device for temporary speed limit message of train control center
  • Automatic test method and device for temporary speed limit message of train control center
  • Automatic test method and device for temporary speed limit message of train control center

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0060] Exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the drawings, it should be understood that the invention may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided for more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.

[0061] The embodiment of the present invention provides a kind of automatic testing method of the train control center temporary speed limit message, the embodiment of the present invention can specifically be a kind of test tool or test software in practical application, and its specific execution steps are as follows figure 1 shown, including:

[0062] 101. Using the engineering data sheet to generate multiple test cases with temporary speed ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an automatic test method and device for a temporary speed limit message of a train control center, relates to the technical field of railway signal system equipment testing, and mainly aims to realize automatic testing of the temporary speed limit message and improve the testing efficiency. According to the main technical scheme, the method comprises the following steps: generating a plurality of test cases with temporary speed limit messages by utilizing an engineering data table; sending the data in the test cases to a corresponding simulator one by one, wherein the simulator is used for simulating an external interface of the train control center, and the data of the test cases is sent to the train control center through the simulator; acquiring message data fedback by the train control center; and comparing the consistency of the fed-back message data and the temporary speed limit messages in the test cases, and recording test resultd and comparison resultof the test cases. The method and the device are used for automatically testing the temporary speed limit messages.

Description

technical field [0001] The invention relates to the technical field of railway signaling system equipment testing, in particular to an automatic testing method and device for a temporary speed limit message of a train control center. Background technique [0002] The Train Control Center (TCC) is an important part of the China Train Control System (CTCS), and sending temporary speed limit messages is one of the important functions of the TCC. If the temporary speed limit message sent by the train control center is incorrect, it will affect the safe operation of the train. Therefore, before the train control center is put into operation at the station, the functions and data of the temporary speed limit message sent by the train control center of the station need to be checked. Coverage tests. At present, the test of the temporary speed limit message sent by the train control center is mainly through manual testing, which requires testers to test one by one according to the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G05B23/02
CPCG05B23/0213
Inventor 徐建华宋青阳张瑞郭海琦张鼎高文博
Owner 卡斯柯信号(北京)有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products