Navigation water area overwater construction safety risk early warning grading method and system

A safety early warning and classification system technology, applied in the direction of instruments, data processing applications, resources, etc., can solve problems such as equipment damage, safety hazards, and lack of safety classification standards for water construction

Pending Publication Date: 2020-08-07
NAT ENG RES CENT OF DREDGING TECH & EQUIP
View PDF5 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, at present, traditional construction ships generally lack real-time environmental monitoring methods for wind, waves and currents. Most of the environmental information comes from the long-term hydrology, waterway and other information collected for the construction area during the construction organization design stage. In the actual construction process Construction personnel mainly rely on weather forecasts to roughly assess conditions such as wind, waves, and currents during construction. There is no real-time and accurate monitoring method for the specific environment of a specific construction area.
Generally speaking, the existing environmental monitoring methods are insufficient, and the monitoring accuracy and timeliness cannot provide timely and effective information support for risk early warning during the construction process.
[0006] (2) There is a lack of grading criteria for water construction safety
[0007] Judging whether the facing environmental conditions meet the requirements of normal construction mainly includes the following two methods: one is to judge whether the facing environmental conditions meet the requirements of normal construction, mainly based on the construction conditions caused by single factors such as flow velocity and waves stipulated in industry specifications Whether it seriously affects the safety of the construction project. Once the degree of influence of a single factor seriously exceeds the limit allowable conditions, it is judged that the construction cannot be carried out normally under this working condition. , the single factor does not exceed the allowable range of the limit, but multiple conditions are in the situation that may bring safety hazards, it is impossible to judge the safety risk level of the overall construction environment in a complex environment considering multiple factors and whether it is satisfied according to industry standards. The conditions of normal construction; the second is to rely on the experience of the captain to comprehensively predict the safety risk level of the construction environment, but this method is obviously limited by the captain’s personal level and experience, and may underestimate the safety risk level of the overall environment and cause potential safety hazards Misjudgment in different ways, such as problems or overestimation of the degree of safety risk faced by construction, which leads to the reduction of construction efficiency, which in turn leads to accidents such as ship collision, equipment damage, and fire
[0008] (3) Insufficient risk warning measures
[0009] At present, the research on construction risk early warning measures mainly focuses on two aspects: ship navigation safety risk assessment and bridge (fan) and other specific project construction risk analysis. There are few studies on safety risk assessment of extensive water construction projects, especially for the navigation field. The establishment of a scientific and comprehensive safety technical index system and the research on mature safety risk early warning systems and methods are still lacking in water construction projects.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Navigation water area overwater construction safety risk early warning grading method and system
  • Navigation water area overwater construction safety risk early warning grading method and system
  • Navigation water area overwater construction safety risk early warning grading method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0076] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that the described embodiments are a part of the embodiments of the present invention, rather than all embodiments, and those of ordinary skill in the art can make some modifications without departing from the concept of the present invention. and improvements. These all belong to protection domain of the present invention.

[0077] The present invention is applied to a large-scale cutter-suction ship sand-filling project of a certain project, and uses a fuzzy comprehensive evaluation method to establish a risk early warning system and method for a large-scale cutter-suction ship sand-fill project, wherein the risk warning classification system is shown in figure 1 . Taking the impact of environmenta...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a navigation water area overwater construction safety early warning grading method and system. The system comprises a core index data module, a real-time monitoring receiving module, a risk analysis module and a risk early warning module. The core index data module comprises a three-level safety index system unit and a user-defined safety index unit, and quantification of each safety index is based on national laws and regulations, industry specifications and experience of industry experts; the real-time monitoring receiving module is used for displaying the construction monitoring data of each safety index in real time and transmitting the monitoring data to the risk analysis module regularly; the risk analysis module comprises an actual measurement risk factor identification unit, a safety risk grade division unit, a single-index risk evaluation unit and a multi-index comprehensive risk evaluation unit, and is used for evaluating the safety risk degree of allfactors and the overall construction environment coupled with the multiple factors; and the risk early warning module displays the risk levels of the safety index factors and the comprehensive evaluation result and the corresponding safety measure suggestions to the construction personnel through the visual safety early warning platform, and is used for risk early warning.

Description

technical field [0001] The invention belongs to the field of early warning of construction risks on water, and in particular relates to a method and system for early warning and classification of safety risks of construction on water in navigable waters. Background technique [0002] The construction of my country's water transportation projects presents a development trend of complexity, large-scale, and deep water. Among them, on the one hand, the environment of the construction water area has become more severe; on the other hand, the overlap and proximity of the construction water area and the shipping route further increases the complexity of the water construction environment. Especially in water construction carried out in busy navigable waters, the interaction between sailing ships and large water construction equipment is constantly changing. [0003] The multi-dimensional and complex construction environment in navigable waters not only brings safety hazards that ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/30
CPCG06Q10/0635G06Q10/067G06Q50/40
Inventor 郝宇驰孙慧朱平曲嘉铭陶润礼冒小丹戴文伯
Owner NAT ENG RES CENT OF DREDGING TECH & EQUIP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products