Construction method of strata reinforcement before shield cutterhead opening
A construction method and shield cutter head technology, which can be applied to earth drilling, underground chambers, shaft equipment, etc., and can solve problems such as inability to complete the vertical reinforcement of the ground
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0028] refer to figure 1 , The present invention provides a construction method for ground reinforcement before the shield cutter head is opened, which is used to solve the problem that the ground vertical soil reinforcement cannot be completed due to the existence of existing structures on the ground. The construction method of the present invention adopts the cross passage as the working surface of the reinforced soil construction, and the cross passage is arranged above the tunnel formed by the tunneling of the shield machine. The bottom of the cross channel is reinforced by drilling and grouting, which avoids the existing structures on the ground and solves the problem that the ground cannot be reinforced vertically. And the construction of soil reinforcement using the transverse channel can be pre-constructed, that is, the soil reinforcem...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com