Construction method of anti-scouring flood relief channel of barrier lake
A construction method and the technology of the drainage channel, which can be applied in water conservancy engineering, marine engineering, barrage/weir, etc., can solve problems such as disasters, downstream flood overflowing the river channel, and the section shape of the drainage channel cannot be maintained.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0053] The technical solution of the present invention will be further described below in conjunction with the accompanying drawings.
[0054] like image 3 , the steps of the construction method of the present invention include: obtaining the lake surface area-water level relationship curve of the barrier lake, and the real-time monitoring data of the flow rate of the barrier lake, predicting the change of the water level of the barrier lake; capacity, determine the cross-sectional shape and size of the discharge chute; reserve part of the accumulation body upstream of the barrier body 1 without excavation, and build an anti-seepage wall to block the rising water level of the barrier lake; excavate according to the designed section Excavate the discharge trough, and excavate a number of 2.0-3.0m deep gravel accumulation pits 4 at the front of the discharge trough. After the discharge trough is excavated, use a soil compactor to compact it. materials, and extend to the downst...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com