Construction method for surface reinforcement treatment after building foundation pouring

A construction method and back surface technology, which is applied in construction, infrastructure engineering, infrastructure repair, etc., can solve the problems of affecting building safety, gaps in cracks, unevenness of crack surface, and achieve the effect of improving building safety

Active Publication Date: 2020-05-29
大庆珑达建工集团有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The invention provides a surface reinforcement treatment construction method after pouring of the building foundation, aiming to solve the following problems existing in the current manual repair of the cracks on the foundation surface: the construction personnel hold a shovel to fill the concrete into the cracks, which consumes a lot of manpower, and the construction efficiency is low. Low, and in the actual construction process, the internal structure of the cracks on the foundation surface is often complex, the surface of the cracks is uneven, it is difficult to fill the cracks with concrete manually, resulting in gaps still existing inside the cracks, seriously affecting building safety

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for surface reinforcement treatment after building foundation pouring
  • Construction method for surface reinforcement treatment after building foundation pouring
  • Construction method for surface reinforcement treatment after building foundation pouring

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways defined and covered by the claims.

[0034] This embodiment provides a Figure 1 to Figure 7 The shown building foundation surface reinforcement processing machine includes a rectangular top plate 1, a support leg 2 is vertically and fixedly installed at the corner of the lower surface of the top plate 1, and a roller 3 is hinged at the bottom of the support leg 2. Two mounting plates 4 are connected to the lower surface of the top plate 1, and the bottoms of the mounting plates 4 are vertical and parallel to each other. A horizontal guide rod 5 and a first screw 6 parallel to the guide rod 5 are installed between the two mounting plates 4 . The first screw 6 is rotated and fitted with a mounting table 7 , and the guide rod 5 runs through the mounting table 7 . The middle position of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of building construction, and particularly relates to a construction method for surface reinforcement treatment after building foundation pouring. The construction method for surface reinforcement treatment after building foundation pouring is completed by being matched with a machine for surface reinforcement treatment after building foundation pouring. The method comprises the following steps of 1, construction preparation: preparing concrete, moving the machine to the position over a crack through a roller, and adjusting the position of the machine so that a guide rod can be parallel to the crack; 2, crack drilling: drilling the crack position through a drilling mechanism, and driving the drilling mechanism to move along the crack through a driving motor to enable the crack to become a V-shaped groove; and 3, concrete filling: conveying the concrete into the V-shaped groove through a plastering plate, and plastering the surface of the filled concrete to enable the repaired surface is flush with the foundation. When the machine for surface reinforcement treatment after building foundation pouring is adopted for crack filling, the crackcan be fully filled, it is ensured that no gap exists in the crack, and building safety is improved.

Description

technical field [0001] The invention belongs to the technical field of building construction, and in particular relates to a construction method for surface reinforcement treatment after pouring of building foundations. Background technique [0002] During the construction of the building foundation, the foundation pit is excavated first, and then the construction cushion, the bottom plate waterproof layer and the foundation need to be constructed at the bottom of the foundation pit. The foundation is usually made of concrete. In the actual construction process, the surface of the foundation after pouring is often unable to be covered in time and fully. Affected by the wind, the sun and the sun, the free water on the foundation surface evaporates too quickly, resulting in a sharp volume shrinkage. At this time, the strength of the concrete foundation is low and cannot resist This deformation stress will cause cracks on the surface of the foundation, seriously affecting the q...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D37/00E02D15/04
CPCE02D15/04E02D37/00
Inventor 赵利朱昌
Owner 大庆珑达建工集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products