An intelligent and quick evaluation method for the insulation reliability of xlpe cable terminals
A cable termination and reliability technology, applied in the field of intelligent and quick evaluation of XLPE cable termination insulation reliability. The effect of explosion and improved operational reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be further described below.
[0027] according to figure 1 Cable leakage current test platform wiring diagram, the specific calculation steps of the present invention are as follows:
[0028] Step 1: Build a cable leakage current test platform
[0029] Connect the No. 1 port 9 of the high-frequency voltage source 1 to the copper terminal 3 of the XLPE cable terminal 6 through the high-voltage test line 2, the No. 2 port 10 is grounded, and the ground wire 5 of the XLPE cable terminal 6 passes through the high-frequency current transformer 4, The high-frequency current transformer 4 is connected to the data collector 7, and the data collector 7 is connected to the host computer 8, and the rated voltage U is applied to the XLPE cable terminal 6, and the leakage current value I is recorded by the host computer 8 n ;
[0030] Step 2: Set the collection cycle
[0031] Data collector 7 collects current data every 5s, and each round of collection...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com