Simulation platform device and method for wellhead environment of deepwater oil and gas production system
A production system and environment simulation technology, applied in teaching models, earthwork drilling, wellbore/well components, etc., can solve the problems of lack of inspection and test methods for marine engineering equipment, failure of equipment to be put into use, and inability to carry out deep-water installation, etc., to achieve The effect of solving difficult testing problems, light weight and convenient installation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Embodiment 1: as Figure 1 to Figure 6 As shown, the simulation platform of the present invention includes the main body of the adsorption chamber 1, the adsorption chamber 2, the channel pipe 7, the discharge pipe 8, the support frame 5, the anti-skid plate 10, the intermediate connection structure 4 between the adsorption chamber and the middle plate 3, the adsorption chamber and the The outer edge connection structure of the middle plate, the connection structure 4 between the middle plate 3 and the upper plate, the wellhead simulation pipe 9, the channel pipe 7 opening and closing valve 15, the wellhead head 11, the discharge pipe 8 switching valve, the upper platform installation plane, and the upper platform installation plate 6 and so on. Among them, the adsorption chamber 2 has a large enough contact area with the seabed, such as 10m×8m, which can provide sufficient adsorption force and ensure the stability of the simulation platform. There are four or more cha...
Embodiment 2
[0041] A method for simulating the wellhead environment of a deep-water oil and gas production system, comprising the following steps:
[0042] Place the main body of the adsorption chamber on the seabed, and install the same passage pipe and discharge pipe on it, and install a wellhead simulation pipe of the required height above the middle of the main body of the adsorption chamber according to the test requirements. A wellhead is installed above the wellhead simulation pipe. simulation platform;
[0043] On the wellhead simulation platform, inject high-pressure water from the channel pipe into the main body of the adsorption chamber, discharge the sludge in the adsorption chamber of the main body of the adsorption chamber from the discharge pipe, and the adsorption chamber is firmly adsorbed on the seabed;
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com