Construction method for cutting pile head anchorage section of pile body
A construction method and technology of anchoring section, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of high noise pollution and high cost, and achieve the effect of reducing construction grinding steps, high flatness, and reducing construction cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] The present invention will be further described below in conjunction with the embodiments, and the described embodiments are only a part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, other used embodiments obtained by persons of ordinary skill in the art without making creative efforts all belong to the protection scope of the present invention.
[0036] In conjunction with accompanying drawing, the construction method of the pile head anchor section of intercepting pile body of the present invention, comprises the steps:
[0037] (1) A reinforcement cage consisting of main reinforcement 1 and stirrup 2 is placed in the foundation pit of the pile foundation, and the upper end of main reinforcement 1 extends out of the stirrup 2 and is placed in the anchorage section 01 of the pile head;
[0038] (2) Set the protection tube 3 on the main reinforcement 1 extending out of the stirrup 2, that is to say, put ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com