Construction method of advanced grouting and pressure maintenance in subsea broken strata of mud-water shield

A technology of advanced grouting and mud-water shielding, which is applied in the direction of earthwork drilling, mining equipment, tunnels, etc., can solve the problems of imperfect and cumbersome pressure-holding construction methods, achieve perfect pressure-holding construction technology, change plasticity, reduce Effect of Clamping Force and Friction

Active Publication Date: 2020-11-24
CHINA RAILWAY 14TH BUREAU GRP LARGE SHIELD ENG CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of advanced grouting reinforcement for muddy water shield seabed broken strata is mainly to grout reinforcement for apoplexy or strongly weathered gabbro that invades into the upper range of the shield tunneling rock layer, so as to prevent the upper part of the shield machine from being damaged when the shield is advancing. Fragments such as gabbro enter the cutter head and mud chamber, block the slurry return port and block the rotation of the cutter head, and the existing construction method of advanced grouting and pressure maintenance is imperfect and cumbersome

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of advanced grouting and pressure maintenance in subsea broken strata of mud-water shield
  • Construction method of advanced grouting and pressure maintenance in subsea broken strata of mud-water shield

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The mud-water shield seabed fractured formation advanced grouting and pressure-holding construction method proposed by the present invention comprises the following steps:

[0023] 1. Prepare balance shield mud.

[0024] Use inorganic clay slurry as liquid A and tackifier as liquid B, add liquid A and water into the mixer at a ratio of 1:2 and stir evenly until there are no agglomerated particles, then mix liquid A and liquid B at a ratio of 15: The ratio of 1 is added to liquid B through a self-priming pump, and it is fully stirred for 15 minutes. After being modified by liquid A, it reacts with liquid B to form a high-viscosity balance mud.

[0025] 2. Preparation before grouting.

[0026] The shield machine protects and blocks the water coming from the rear, injects the balance shield mud to the outside of the shield shell through the 8 radial holes on the shield shell of the shield machine, changes the plasticity of the soil wrapped around the shield shell, and red...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a slurry shield submarine broken stratum advanced grouting pressure maintaining construction method. The method comprises the following steps that preparation is carried out before grouting, particularly, water coming from rear is protected and plugged through a shield machine, balance shield mud is injected into the outer side of a shield shell of a middle shield through aradial hole in the middle shield of the shield machine; horizontal drilling grouting is carried out on an advanced grouting hole of the shield machine, and grouting segmentation is carried out, wherein the grouting reinforcement range is calculated according to the grout diffusion radius 2-3 meter; grouting reinforcement is carried out on a grouting hole of a left-line tunnel till the machine completely passes through the fragmentation area; grouting reinforcement is carried out on crushed gabbro at the front end of a right-line tunnel shield; and propelling is stopped when the tunneling distance of the shield machine is about 10m from the reinforcement position, and the machine continues to be propelled to pass through the fracture reinforcement area after grouting reinforcement of the gabbro fracture zone is completed. The method is mainly applied to the mud membrane wall protecting of bin opening operation under pressure, stagnation and drainage prevention in tunneling and gushingcontrol in tunneling, has a perfect pressure maintaining construction process, changes plasticity of soil body wrapped outside the shield shell, and reduces clamping force and friction force caused bythe stratum around the shield shell.

Description

technical field [0001] The invention relates to the technical field of shield tunneling, in particular to a mud-water shield construction method for advance grouting and pressure-maintaining construction of subsea broken strata. Background technique [0002] Sea area groundwater mainly refers to the groundwater in the strata within the sea area. According to its occurrence form, it can be divided into three types: loose rock pore water, weathered residual pore fissure water and bedrock fissure water. Among them, loose rock pore water occurs in the fourth In the Holocene marine deposits, the weathered residual pore fissure water occurs in the fully weathered bedrock layer, and the bedrock fissure water occurs in the bedrock weathering fissures and structural fissures below the fragmented strong weathering zone. There is a hydraulic connection between the groundwater in the sea area and the sea water. In the sea area, except for the sand layer, the gravel soil layer, and the p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/00E21D9/06
CPCE21D9/001E21D9/0671
Inventor 陈建福王晓琼刘四进吴玉礼陈兴飞张成君徐磊
Owner CHINA RAILWAY 14TH BUREAU GRP LARGE SHIELD ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products