Subway shallow-buried excavation tunnel underneath pass main traffic road pipe curtain construction method

A shallow buried excavation and tunnel technology, which is applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as pipeline deformation, surrounding rock collapse and roof fall, and small vault distance, so as to save construction time and reduce road surface settlement Effect

Pending Publication Date: 2019-10-18
CHINA RAILWAY NO 9 GRP NO 7 ENG CO LTD +1
View PDF0 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the acceleration of urbanization, the subway has been widely used in major cities. The subway lines are mostly laid along the traffic roads, which are divided into two parts: the section and the station. The station is divided into two parts: the main part and the auxiliary part. Under normal circumstances, the entrances and exits are set on both sides of the traffic road, and underground excavation is required to connect with the station hall. Due to the height limit of the station hall, the underground excavation section of the entrance and exit needs to be buried in shallow depths. The method passes through the traffic road. Due to the shallow buried depth of the excavation section at the entrance and exit, the surrounding rock is generally miscellaneous fill, silty clay, sand, and a small part of strongly weathered rock. At the same time, a number of municipal pressured and non-pressured pipelines are buried under the road. The distance between the bottom of the pipeline and the vault is small, and the construction method of using the pipe shed ahead of the small conduit is too risky, and problems such as surrounding rock collapse and roof fall and pipeline deformation are very likely to occur

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Subway shallow-buried excavation tunnel underneath pass main traffic road pipe curtain construction method
  • Subway shallow-buried excavation tunnel underneath pass main traffic road pipe curtain construction method
  • Subway shallow-buried excavation tunnel underneath pass main traffic road pipe curtain construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] Such as figure 1 As shown in the figure, a subway shallow-buried underground excavation tunnel passes through the main traffic road pipe curtain construction method. The steps are as follows: 1) pipe installation: the outer side of the hollow steel pipe is welded with a locking structure, and several steel pipes are installed in sequence according to the direction of the locking structure; 2) Site leveling; 3) Measurement and stakeout; 4) Drilling pipe jacking: There is a coaxial auger rod 2 running through the middle of the steel pipe, and the center of the auger rod 2 is provided with a guiding measurement hole. The debris is discharged from the steel pipe through the auger drill pipe 2, and the jacking of the steel pipe and the unearthing of the screw are carried out at the same time, until the jacking of the steel pipe is in place, and each steel pipe is constructed in turn; 5) Grouting: use a double-liquid grouting pump for grouting , using cement slurry, the grout...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a subway shallow-buried excavation tunnel underneath pass main traffic road pipe curtain construction method. The method comprises the following steps that pipe installation is conducted, a lock catch structure is welded to the outer side of a cavity steel pipe, and a plurality of steel pipes are sequentially installed in the walking direction of the lock catch structure;secondly, field leveling is conducted; thirdly, measuring lofting is conducted; fourthly, drilling pipe jacking is conducted, a coaxial spiral drill rod penetrates through the middles of the steel pipes, a guiding measuring hole is formed in the center of the spiral drill rod, the spiral drill rod drives a drill bit to rotate, scraps are discharged out of the steel pipes through cutting residues via the spiral drill rod, steel pipe jacking and spiral soil discharging are conducted at the same time till the steel pipes are jacked in place, and various steel pipes are sequentially conducted; andfifthly, grouting is conducted, a double-liquid-slurry grouting pump is adopted for grouting, cement paste is adopted, and the grouting pressure is controlled at 0.5-1 Mpa.

Description

technical field [0001] The invention relates to a construction method, in particular to a construction method for a subway shallow-buried underground excavation tunnel passing under a main traffic road pipe curtain, and belongs to the field of subway pipeline construction. Background technique [0002] With the acceleration of urbanization, the subway has been widely used in major cities. The subway lines are mostly laid along the traffic roads, which are divided into two parts: the section and the station. The station is divided into two parts: the main part and the auxiliary part. Under normal circumstances, the entrances and exits are set on both sides of the traffic road, and underground excavation is required to connect with the station hall. Due to the height limit of the station hall, the underground excavation section of the entrance and exit needs to be buried in shallow depths. The method passes through the traffic road. Due to the shallow buried depth of the excav...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/00E21D11/15E21D11/10E21D11/38
CPCE21D11/00E21D11/15E21D11/10E21D11/38
Inventor 王增雷杨武杨济瑞燕辉胡万佳董光吕涛李志明潘博张启忠
Owner CHINA RAILWAY NO 9 GRP NO 7 ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products