Displaced member correcting process for timber frame building
A wooden frame and building technology, applied in construction, building maintenance, building construction, etc., to reduce construction costs and improve effectiveness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0018] In this embodiment, a kind of process of striking and pulling out a wooden frame building comprises the following steps:
[0019] S1. First put the building with severe crookedness on the top of the pole to prevent further crookedness and collapse;
[0020] S2. Remove the tile surface, shovel off the mud back, remove the gable, sill wall and other supporting roofs, remove the watchboard and rafters, and expose the large wooden structure;
[0021] S3. Remove the wooden tenons and bayonets at the mortise and tenon joints of the wooden frame, and loosen the iron parts if there are iron parts;
[0022] S4. On the outer skin of the column, add the middle line and ascending line;
[0023] S5, prop up the mast to the opposite direction of the crooked frame, and at the same time, straighten and straighten the frame to make the crooked frame return to normal;
[0024] S6. Stabilize the closing bar and cover the bayonet again, block the eye opening, add iron work, pad the colum...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com