Post-evaluation method for new technology application
A new technology and post-evaluation technology, applied in the field of post-evaluation of new technology applications, can solve the problems of unobjective and incomparable evaluation results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0064] A post-evaluation method for the application of new technologies, including the following steps:
[0065] (1) Items evaluated after establishment;
[0066] (2) Determine the scale and characteristics of the project, as well as the characteristics of the new technology applied in the project;
[0067] (3) Determine the post-evaluation purpose and basis of the project;
[0068] (4) According to the content determined in steps (2) and (3), formulate the specific content that requires post-evaluation, and collect and organize documents and data related to the specific content as the supporting materials for post-evaluation;
[0069] (5) Post-assessment indicators are set, and the post-assessment indicators include basic indicators and comprehensive indicators;
[0070] The basic index is an index that reflects whether the new technology can meet the most basic or common needs of the project. The basic index is set to a qualified value according to the relevant standard do...
Embodiment 2
[0074] A post-evaluation framework for the application of new technologies, including:
[0075] (1) Project overview, including project overview, evaluation purpose, evaluation basis and evaluation content;
[0076] (2) The summary and evaluation of the whole process of the project, including the summary and evaluation of the early decision-making of the project, the summary and evaluation of the implementation of the project construction, and the summary and evaluation of the project operation. Determination of requirements and main technical solutions, the project operation summary and evaluation include project capability evaluation and operation status evaluation;
[0077] (3) Project effect, benefit and sustainability assessment, including project technical level assessment, project economic benefit assessment, project resource and environmental benefit assessment, project social benefit assessment, and project sustainability assessment;
[0078] (4) The overall evaluati...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com