A multi-level collision-avoiding construction platform for noise-reducing and dust-proof building construction
A technology for building construction and construction platform, applied in the direction of building, building components, building structure, etc., can solve the problems of insufficient buffer and anti-collision structure, inconvenient buffer protection, and insufficient structure.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0032] as attached figure 1 to attach Figure 8 Shown:
[0033]The present invention provides a multi-stage collision-avoiding construction platform for noise-reducing and dust-proof building construction, including: a main body 1, a bottom part 101, a buffer block 102, a card slot 103, a pull plate 104, a card part 105, and sound-proof cotton 106 , Block 107, Top Plate 2, Contact Block 201, Telescopic Rod 202, Connector 3, Inner Groove 301, Flip 302, Anti-skid Pad 303, Moving Block 4, Chute 401, Slider 402, Pulley 403, Puller 5 , baffle plate 501, embedded bin 502, guide groove 503, receiving member 6, contact wheel 601, support rod 602 and control block 603; the main body 1 is a rectangular internal hollow structure, and the bottom of the main body 1 is installed by bonding There is a bottom piece 101 with a rectangular strip structure made of rubber material, and the two sides and the rear of the main body 1 are provided with a rectangular structure installation warehouse...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com