High-speed railway traction substation limited space accidental entering prevention monitoring system
A traction substation, limited space technology, applied in the field of anti-misentry monitoring system, can solve the problem of not being able to grasp the status of high-voltage cables in real time, endangering personal safety, and no remote alarm.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0051] like Figure 1-12 As shown, this high-speed railway traction substation limited space anti-mis-entry monitoring system is characterized in that: it is mainly composed of the main control system 43, SF 6 Monitoring system 44, O 2 Monitoring system 45, water level monitoring system 46, exhaust air control system 47 and display alarm system 48 are composed. The main control system 43 is installed in the control room of the traction substation to realize the functions of CANOPEN master station and WEB server, and control each CANOPEN slave Station section, namely SF 6 Monitoring system 44, O 2The monitoring system 45, the water level monitoring system 46, the exhaust air control system 47 and the display alarm system 48 work. When it is detected that the corresponding monitoring parameter data of each CANOPEN slave station part exceeds the limit, the alarm is realized, and according to the monitoring within the limited space of the traction substation In some cases, issu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com