Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

BIM-based forward design and operation and maintenance management system for foundation pit engineering

A technology of operation and maintenance management and engineering, applied in the direction of infrastructure engineering, design optimization/simulation, computer-aided design, etc., can solve the problems of 2D design that cannot obtain drawing data and quantity in time, and lack of execution and management, so as to reduce engineering Effects of investment cost, avoidance of harm and loss, and reduction of mistakes

Active Publication Date: 2018-11-23
HEBEI UNIV OF TECH
View PDF6 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The technical problem to be solved by the present invention is to provide a BIM-based forward design and operation and maintenance management system for foundation pit engineering. The 2D design of the project cannot obtain the drawing data and quantity in time, and there are problems in the implementation and management. Moreover, the operation and maintenance management of BIM is used to grasp the real-time facility status and realize multi-party and multi-platform communication.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0042] In this example, the first phase of the reconstruction and expansion of a children’s hospital is taken as an example. The project is located at the intersection of two main roads in the urban area and within the current site of the children’s hospital. The project is divided into 4 small foundation pits, namely an underground garage and a new complex. , Sewage station, parking tower garage, this embodiment takes two foundation pits of the underground garage and parking tower garage as the design objects. The planned underground construction area of ​​the project is 9,330 square meters, and the maximum depth of the foundation pit is about 11m.

[0043] Select components from the three-dimensional component library through the BIM forward design functional area, establish the BIM forward three-dimensional design model of the foundation pit of the underground garage and parking tower garage, export the calculation book and 3D print the BIM forward design plan for Construction...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention is a BIM-based forward design and operation and maintenance management system for foundation pit engineering. The system can generate a three-dimensional design model and check the model, and utilize BIM operation and maintenance management to guide construction through BIM forward design, so that the manager can clearly grasp the state of the facility, and maintain, update and eliminate the equipment in real time to avoid greater harm and loss. The system is equipped with a cloud and the BIM model can be lightened and uploaded to the cloud, so that multiple parties can participate in the maintenance of the facility, and the emergency processing can also be performed online, which greatly reduces the engineering investment cost.

Description

Technical field [0001] The invention relates to a BIM-based forward design and operation and maintenance management system for foundation pit engineering. Background technique [0002] At present, the process of architectural design is a linear two-dimensional design, and it is a linear process from all aspects, units, and the operation and maintenance management of the building. Moreover, if there is a drawing change, each drawing needs to be revised, the workload is huge, and the drawing data cannot be obtained in time, and the quantity cannot be directly obtained. [0003] The BIM model has the characteristics of one change and update everywhere, which can satisfy the real-time update of the model. As a 3D geometric model that can be regarded as a digitized building information model, all components in the model are solid building components, and contain various types of data information about construction and engineering. These data can be used for BIM system calculation analy...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50E02D17/02
CPCE02D17/02G06F30/23G06F30/13G06F2119/06
Inventor 肖成志薛鑫磊齐红升王子寒景晓昆
Owner HEBEI UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products