Resource control method and device for network slice
A network slicing and resource control technology, applied in the field of resource control devices for network slicing, can solve the problems of incomplete resource control coverage and low automation, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 example
[0112] Resource usage threshold 1 of the first instance: action1
[0113] Resource usage threshold 2 of the first instance: action2
[0114] Resource usage threshold 3 of the first instance: action3
[0115] The first business capacity threshold 1: action1
[0116] The first service capacity threshold 2: action2
[0117] The first business capacity threshold 3: action3
no. 1 example
[0118] Fault alarm information 1 of the first instance: action1
[0119] Fault alarm information 2 of the first instance: action2
[0120] Fault alarm information 3 of the first instance: action3
[0121] First time arrangement 1: action1
[0122] First time arrangement 2: action2
[0123] The first time arrangement 3: action3
[0124] In this example, each dimension can be divided into three levels. For example, the first preset instance resource usage threshold can be set with threshold 1, threshold 2, and threshold 3, and correspondingly set with action1, action2, and action3. After obtaining the resource usage of the first instance, judge whether the resource usage of the first instance is greater than one of the preset threshold 1, threshold 2, and threshold 3, and if so, obtain the corresponding action, for example, if it is greater than the threshold 3, the decision information is Action3, of course, can also only have one threshold, which is not limited in this emb...
no. 2 example
[0137] Second instance resource usage threshold 1: action1
[0138] Second instance resource usage threshold 2: action2
[0139] Second instance resource usage threshold 3: action3
[0140] The second business capacity threshold 1: action1
[0141] The second business capacity threshold 2: action2
[0142] The second business capacity threshold 3: action3
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com