Semi-girder type steel pipe pile and construction method thereof
A steel pipe pile and arm type technology, which is applied to sheet pile walls, foundation structure engineering, construction, etc., can solve problems such as low bearing capacity and smooth side walls, and achieve improved strength, convenient operation, increased side friction and The effect of carrying capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Such as Figure 1-3 Shown:
[0041] An outrigger type steel pipe pile, comprising a pile body 1 and a pile tip 2, the pile body 1 is a steel pipe structure, the pile tip 2 is a conical structure with a closed bottom, the pile body 1 and the pile tip 2 are integrally formed , the inside of the pile body 1 is a cavity structure, and the pile body 1 is connected with an outrigger 4 that can extend out of the pile body 1 and insert into the soil; after the outrigger is inserted into the soil, the steel pipe pile is greatly increased. The side friction and bearing capacity meet the requirements of building foundation reinforcement and expand the scope of application;
[0042] The outrigger 4 is a hollow structure with one end closed and the other end open, and the cavity communicates with the hollow structure through the opening; the outrigger 4 includes a first outrigger 4-1 arranged perpendicular to the pile body 1 and a Inclined to the second outrigger 4-2 that pile bod...
Embodiment 2
[0054] Embodiment 2 is the construction method of Embodiment 1, and the specific method is: a construction method of an outrigger type steel pipe pile, and its specific steps are as follows:
[0055] 1) Provide an outrigger type steel pipe pile as described in Embodiment 1;
[0056] 2) Set out the line to determine the pile position, use the suspension ring to suspend the outrigger type steel pipe pile directly above the pile position, and align the pile tip with the middle position of the pile position;
[0057] 3) Start the pile driver and slowly insert the outrigger steel pipe pile into the foundation;
[0058] 4) When the pile body reaches the predetermined depth, cover the pile cover 3, use a high-pressure air pump to inject high-pressure gas into the cavity through the high-pressure inflation hole 31 on the pile cover 3, and stabilize the pressure for 13-18 minutes to ensure that the extension The arm 4 is fully stretched out and inserted into the soil body;
[0059] 5...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com