Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Engineering cost control method based on BIM technology

A technology of engineering cost and control method, which is applied in the field of construction, can solve the problems of not being able to achieve real-time and forward-looking, repeated work, and long working hours, etc., to achieve real-time cost control management, real-time and forward-looking, and improve The effect of work efficiency

Inactive Publication Date: 2018-09-18
四川成化工程项目管理有限公司
View PDF1 Cites 23 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the traditional cost control process of construction projects, the original hand calculation or experienced masters are used to estimate and the computer's simple engineering quantity measurement, and then set the price. Using this method has cumbersome procedures, long working hours, and many repetitive tasks. , the data is inaccurate, the workload is heavy, and the real-time and forward-looking characteristics of cost control cannot be achieved

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering cost control method based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The specific embodiments of the present invention are described below so that those skilled in the art can understand the present invention, but it should be clear that the present invention is not limited to the scope of the specific embodiments. For those of ordinary skill in the art, as long as various changes Within the spirit and scope of the present invention defined and determined by the appended claims, these changes are obvious, and all inventions and creations using the concept of the present invention are included in the protection list.

[0035] refer to figure 1 , figure 1 It shows the engineering cost control method based on BIM technology; as figure 1 As shown, the method 100 includes step 101 to step 108 .

[0036] In step 101, the project bidding documents, project list and construction drawings are obtained, and the project cost documents related to the construction cost in the project bidding documents, project list and construction drawings are ext...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an engineering cost control method based on BIM technology. The engineering cost control method comprises the steps of extracting a project biding file, a project list and an engineering cost file which is related with cost; creating a project template which comprises all engineering components of the project engineering; endowing detailed list information in the project list to corresponding engineering components; calculating the engineering amount of the engineering components according to dimensions of the engineering components in a three-dimensional model and thedetailed list information of the corresponding engineering component; calculating the construction cost of the construction project; dividing the three-dimensional model into a plurality of construction blocks according to a construction plan, and endowing one area number to each construction block; receiving the construction picture of the construction field, and obtaining the construction progress of the current construction block according to the construction information in the construction picture; and when the construction progress does not match a preset construction progress, predicating the construction time and construction cost in finishing engineering according to the current construction progress, the residual engineering amount and reference engineering cost.

Description

technical field [0001] The invention relates to construction management in the construction field, in particular to a method for controlling project cost based on BIM technology. Background technique [0002] BIM technology (Building Information Modeling) is usually translated as Building Information Modeling. As a new technology in the engineering construction industry, BIM technology emphasizes the application of coordinated information in all stages of the project life cycle, and its most intuitive form of expression is the 3D building model with project information. The 3D information model is no longer an immutable exhibit, but an intelligent information carrier, and with the enrichment and transmission of information, the model will become the core and data basis for specific applications in each stage of the project's life cycle. [0003] With the gradual promotion of BIM technology in construction engineering, more and more design units, construction units and const...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor 马浩汪敏余珍璐赵梁材毛静
Owner 四川成化工程项目管理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products