Tendency progressive outburst elimination roadway arrangement method
A technology of roadway layout and inclination, applied in safety devices, earthwork drilling, gas discharge, etc., can solve the problems of production delay of working face, reduction of effective protection range, and increase of outburst prevention works.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Such as figure 1 As shown, a method for arranging roadways with a tendency to progressively eliminate outbursts of the present invention includes the following steps:
[0020] a. After the mining of the working face in the upper section is completed, when the overlying strata of the goaf (1) is basically stable, a 2-5m coal pillar (2) or no coal pillar (2) is left along the edge of the goaf (1) 2) Excavate the return air level entry (3) in this section, and carry out at least two regional verifications every 10-15m during the excavation period.
[0021] b. Parallel bedding boreholes (7) are arranged along the strike in the return air entryway (3) and connected with the extraction pipeline to extract gas from the coal seam in a certain lower area. Among them, the sealing length of the bedding holes (7) is 8m-10m, the row spacing between the bedding holes (7) is 2m-4m, the diameter of the bedding holes (7) is 75mm-110mm, and the bedding drilling (7) The length is 60m to...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com