Embodiment 1
[0026] High-permeability penetrating oil for semi-rigid pavement base, made of the following raw materials in parts by weight: 400-600 parts of asphalt, 80-120 parts of kerosene, 10-20 parts of emulsifier, 15-25 parts of hydrochloric acid, 300- 400 copies.
[0027] It is prepared from the following raw materials in parts by weight: 450-550 parts of asphalt, 90-110 parts of kerosene, 12-18 parts of emulsifier, 18-22 parts of hydrochloric acid and 340-380 parts of water.
[0028] It is made from the following raw materials in parts by weight: 500 parts of asphalt, 100 parts of kerosene, 15 parts of emulsifier, 20 parts of hydrochloric acid and 365 parts of water.
[0029] The asphalt is high-permeability emulsified asphalt.
[0030] The model of the emulsifier is MQK-1M.
[0031] As the above-mentioned preparation method for the high-permeability penetrating oil of semi-rigid pavement base, the concrete steps are as follows:
[0032] (1) Heat the asphalt to 120-140°C;
[003...
Embodiment 2
[0036] The high-permeability penetrating layer oil for semi-rigid pavement base is made of the following raw materials in parts by weight: 400kg of asphalt, 80kg of kerosene, 10kg of emulsifier, 15kg of hydrochloric acid, and 300kg of water.
[0037] The asphalt is a high-permeability emulsified asphalt.
[0038] The model of the emulsifier is MQK-1M.
[0039] As the above-mentioned preparation method for the high-permeability penetrating oil of semi-rigid pavement base, the concrete steps are as follows:
[0040] (1) Heat the asphalt to 120°C;
[0041] (2) After mixing kerosene, emulsifier, hydrochloric acid and water, heat to 50°C;
[0042] (3) Pass the heated raw materials in step (1) and step (2) into the colloid mill at the same time, grind them, and mix the raw materials evenly to obtain high-permeability penetrating layer oil.
Embodiment 3
[0044] The high-permeability penetrating layer oil used for semi-rigid pavement base is made of the following raw materials in parts by weight: 440kg of asphalt, 90kg of kerosene, 12kg of emulsifier, 17kg of hydrochloric acid, and 320kg of water.
[0045] The asphalt is a high-permeability emulsified asphalt.
[0046] The model of the emulsifier is MQK-1M.
[0047] As the above-mentioned preparation method for the high-permeability penetrating oil of semi-rigid pavement base, the concrete steps are as follows:
[0048] (1) Heat the asphalt to 124°C;
[0049] (2) After mixing kerosene, emulsifier, hydrochloric acid and water, heat to 54°C;
[0050] (3) Pass the heated raw materials in step (1) and step (2) into the colloid mill at the same time, grind them, and mix the raw materials evenly to obtain high-permeability penetrating layer oil.
PUM
Property | Measurement | Unit |
---|---|---|
penetration depth | aaaaa | aaaaa |
penetration depth | aaaaa | aaaaa |
penetration depth | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com