Field elimination method for eliminating continuous multi-day meter reading data deficiency fault of electric energy meter
A power meter, data-free technology, applied in the field of on-site disinfection, can solve the problems of low on-site processing efficiency, easy to misjudgment, missed judgment, repeated judgment, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0090] The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0091] The on-site fault elimination method that the electric energy meter has no meter reading data failure for several days includes the first on-site fault elimination method in which the local communication mode is non-RS485 and the second on-site fault elimination method in which the local communication mode is RS485;
[0092] 1. The first on-site defect elimination method includes a preparation step and a defect elimination step.
[0093] Among them, the preparatory steps: summarizing the failure causes of all the energy meters under the I-type concentrator with no data; selecting the most optimized I-type concentrator for the energy meter with no data; summarizing all the I-type concentrators for the energy meters The fault handling method with no data; the processing results are fed back to the on-site defect elimination syst...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com