Reinforcing type ecological slope protection structure and construction method thereof
A technology of ecological slope protection and construction method, which is applied in basic structure engineering, botanical equipment and methods, excavation, etc., can solve the problems of vegetation net plant damage, affecting the installation and fixation of vegetation net, etc., and achieves the goal of improving stability and reducing the difficulty of laying. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Embodiment one, a kind of reinforcement type ecological slope protection structure, refer to figure 1 , including a cleaned and leveled base soil layer 1, a geocell 2 laid on the base soil layer 1, a three-dimensional vegetation net 3, and a vegetation layer 4 that finally grows into green vegetation.
[0040] There are insertion holes 5 in a rectangular array at the upper end of the base soil layer 1, and a steel drill as a fixing rod 6 is arranged on each insertion hole 5, and at the same time, the fixing rod 6 and the insertion holes 5 are fixed by cement mortar, The fixed rod 6 can enhance the overall stability of the upper end of the base soil layer 1 through the cured cement mortar.
[0041] refer to figure 2 , the geocell 2 is provided with a limit hole 7 at the rotation position, and at the same time a anti-corrosion pipe 8 made of polyethylene or polypropylene is fixed in the limit hole 7; when the geocell 2 is laid and installed, only The anticorrosion pipe...
Embodiment 2
[0044] Embodiment two, a kind of construction method of above-mentioned embodiment one, comprises steps:
[0045] ①Slope leveling: artificial leveling, eliminating all rocks, broken mud, plants, garbage, and backfilling the improved soil with a thickness of 90~100mm;
[0046] ② Drainage facility construction: Excavate a rectangular trench with a width of 300mm and a depth of not less than 200mm. On the other hand, it can be considered whether to set up a horizontal drainage ditch on the slope according to the flow rate of the slope;
[0047] ③Construction of geocell 2: On the slope surface, threaded steel is used to drill holes to form socket holes 5, insert fixed rods 6 into socket holes 5, and then pour cement with a ratio of 1:3 into socket holes 5 Mortar, the fixed rod 6 is fixed,
[0048] Then when laying the geocell 2, the anti-corrosion pipes 8 in the limit holes 7 of the geocell 2 are distributed and plugged into each fixing rod 6, and finally the cells of each geocel...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com