Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Construction method of reinforced concrete airtight wall and application of construction method

A reinforced concrete and construction method technology, which is applied in the direction of earthwork drilling, filling, safety devices, etc., can solve the problems of underground environmental pollution, slurry running, and overall collapse of retaining walls, etc., and achieves extensive sources, low cost, and operability strong effect

Active Publication Date: 2017-09-19
JIANGXI UNIV OF SCI & TECH
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the improper construction of the retaining wall in some mines, problems such as slurry running and sand leakage often occurred during the filling process, and serious accidents such as the overall collapse of the retaining wall occurred, resulting in underground environmental pollution and difficulties in handling sand leakage.
In order to improve the safety of the filling retaining wall, some mines increase the thickness of the retaining wall, resulting in increased consumption of filling materials and longer construction time, which in turn leads to low efficiency of mining and filling operations.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of reinforced concrete airtight wall and application of construction method
  • Construction method of reinforced concrete airtight wall and application of construction method
  • Construction method of reinforced concrete airtight wall and application of construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0035] A construction method for a reinforced concrete airtight wall, comprising the steps of:

[0036] Step 1: Drill vertical formwork hole 1, fabric reinforcement hole 6

[0037] Such as figure 1 and figure 2 As shown, the vertical formwork holes 1 are drilled on the side walls 5 on both sides of the airtight wall to be poured, and each side is divided into three rows from bottom to top, and each row has two vertical formwork holes 1 on the same plane, and vertically Form two rows of holes, the horizontal distance between the two rows of vertical mold holes 1 is 50cm, the bottom row is 0.3m away from the bottom plate of the pouring position, and the vertical distance between each row of vertical mold holes 1 is 1m. A rib hole 6 is arranged in the middle of the mold hole 1, and five rib holes 4 with an equal distance of 70cm are arranged on both sides from bottom to top, and the bottom rib hole 6 is 0.3m away from the bottom plate of the pouring position, and the vertical ...

Embodiment 2

[0049] A construction method for a reinforced concrete airtight wall, comprising the steps of:

[0050] Step 1: Drill holes for vertical formwork and fabric reinforcement

[0051] Drill vertical formwork holes on both sides of the airtight wall to be poured, each side is divided into three rows from bottom to top, each row has two vertical formwork holes on the same plane, and forms two columns of holes in the vertical direction, two The horizontal distance between the vertical formwork holes in a row is 40cm, and the bottom row is 0.3m away from the bottom plate of the pouring position. Five rib holes with an equal distance of 60cm are set on both sides from bottom to top, and the bottom rib hole is 0.3m away from the bottom plate of the pouring position, and the hole depth of the vertical formwork is 50cm, and the depth of the hole hole is 70cm;

[0052] Step 2: Reinforcement

[0053] Insert 3m of rebar into the reinforcement holes of both side sides, fix the intersecting ...

Embodiment 3

[0063] A construction method for a reinforced concrete airtight wall, comprising the steps of:

[0064] Step 1: Drill holes for vertical formwork and fabric reinforcement

[0065] Drill vertical formwork holes on both sides of the airtight wall to be poured, each side is divided into three rows from bottom to top, each row has two vertical formwork holes on the same plane, and forms two columns of holes in the vertical direction, two The horizontal distance between the vertical formwork holes in the row is 60cm, the bottom row is 0.3m away from the bottom plate of the pouring position, the vertical distance between each row of vertical formwork holes is 1.1m, and the reinforcement holes are arranged in the middle of the two columns of vertical formwork holes on both sides of the side. Five rib holes with an equal distance of 80cm are set on both sides from bottom to top, and the bottom rib hole is 0.3m away from the bottom plate of the pouring position, and the hole depth of t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a reinforced concrete airtight wall and an application of the construction method. The construction method comprises the following steps of mould hole punching and erecting, rib hole placing, rib distributing, formwork erecting, drainage pipe mounting, cement brick wall laying, slurry plastering, wall bracing arranging and the like. The construction method can be used for construction of an airtight wall when a goaf is filled through a downward horizontal layered road approaching type cementing filling mining method. Raw materials for constructing the airtight wall are common building materials, special machining is not needed, the construction process is simple, the professional skill requirement for constructors is not high, operability is high, the using materials are transported to a site, construction of the airtight wall (not comprising hollow brick building top sealing) can be completed through 2 workers within 8 hours, and the problems that currently, when an airtight wall is constructed, labor and time are wasted, safety and reliability are poor, the economic cost is high, and spread of sudden accidents cannot be quickly and effectively restrained are solved.

Description

technical field [0001] The invention relates to the technical field of mine safety construction, in particular to a construction method and application of a reinforced concrete airtight wall. Background technique [0002] Due to the advantages of safe operation, small ore loss, delay or even prevention of engineering geological disasters such as surface subsidence and deep rockburst, filling mining method is more and more used in actual mine production. In the filling mining process, the construction of the filling retaining wall is an important preparatory work that must be completed before filling. The construction quality of filling retaining wall directly affects the efficiency, cost and filling quality of filling operation. Due to improper construction of the retaining wall in some mines, problems such as slurry running and sand leakage often occurred during the filling process, and serious accidents such as the overall collapse of the retaining wall occurred, resultin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21F15/04
CPCE21F15/04
Inventor 钟春晖赵奎
Owner JIANGXI UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products