Double sleeve valve pipe grouting construction method

A sleeve valve tube grouting and sleeve valve tube technology, which is used in infrastructure engineering, soil protection, construction, etc., can solve the problems of grouting liquid being unable to solidify, low grouting pressure, and large diffusion radius, so as to ensure effective The effect of diffusion radius, reducing porosity and accelerating construction progress

Inactive Publication Date: 2017-07-14
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP OF THE FIFTH ENG
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Aiming at the sleeve valve pipe grouting method, after many experiments, it was found that there are some problems in the simple sleeve valve pipe construction method in such crack-developed areas: using sleeve valve pipe + pure cement slurry, cracks and caves develop, so inject pure water grout When grouting, the grouting fluid cannot solidify in a short time, resulting in a large diffusion radius, and it is difficult to fill all the cracks, resulting in a large amount of grouting and low grouting pressure; use sleeve valve tube + chemical grouting fluid ( Cement + water glass + accelerator), the mixing ratio is not easy to control, when the amount of water glass and accelerator is small, it will still not be able to solidify in a short time; after increasing the amount of water glass + accelerator, the injection of sleeve valve tube The grout inner pipe cannot move because the grout solidifies too fast

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0030] The present invention is realized through the following technical solutions: the construction method of double sleeve valve pipe grouting comprises the following steps:

[0031] Step S1: preparatory work before construction;

[0032] Step S2: The drilling machine is in place and drilled to form a hole;

[0033] Step S3: making casing material and injecting the casing material into the hole; injecting the casing material into the hole to form a casing.

[0034] Step S4: installing the double sleeve valve tube; the double sleeve valve tube refers to two sleeve valve tubes bundled into one;

[0035] Step S6: using a grouting machine to perform two segmented grouting;

[0036] Working principle: The grouting liquid of 0.6:1 cement slurry + 2% water glass + 5% quick-setting agent is used to precisely control the initial setting time of the grouting liquid, to avoid the grouting liquid from being too fast with the cracks, and to reduce the amount of cement. Save investme...

Embodiment 2

[0038] This embodiment is further optimized on the basis of the above embodiments, and the step S1 specifically includes the following steps:

[0039] Step S11: grouting process design;

[0040] Step S12: measurement and stakeout;

[0041] Said in step S11, at first adopt water drill to carry out construction site trial drilling, determine the specific distribution of cracks in the vertical direction according to the water level change of the borehole, and then determine the segmented quantity of the sleeve valve pipe, determine the injection according to the descending rate of the borehole water level The mixing ratio of the slurry; the instrument for measuring and setting out in the step S12 uses a total station to measure the hole position and the ground elevation.

[0042] Other parts of this embodiment are the same as those of the foregoing embodiments, so details are not repeated here.

Embodiment 3

[0044] This embodiment is further optimized on the basis of the above embodiments. The casing material in the step S3 is made of cement, bentonite, and water in a weight ratio of 1:1.5:1.88, or cement, fly ash, bentonite, Water is made in a weight ratio of 1:0.5:1:1.3.

[0045] It should be noted that, through the above improvements, the casing material prepared in the above ratio is used, the casing strength is also open-loop to prevent slurry crossing, and the casing is poured when the hole is drilled to the design depth, and the mixing is done by using the drill pipe. The casing material is pressed into the hole, the drill pipe is placed at the bottom of the hole during pouring, and the casing material is pressed in through the cement slurry pump until the cement slurry in the hole is completely replaced by the casing material.

[0046] Other parts of this embodiment are the same as those of the foregoing embodiments, so details are not repeated here.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a double sleeve valve pipe grouting construction method. The double sleeve valve pipe grouting construction method comprises the following steps that work is prepared before construction; a drilling machine is in position and drills a hole, and a built-up hole is formed; a shell material is prepared, and the shell material is injected into the built-up hole to form a shell; the double sleeve valve pipe is mounted; the double sleeve valve pipe is formed by two sleeve valve pipes bundled together; and double sectional grouting is conducted through a grouting machine. Compared with the prior art, the double sleeve valve pipe grouting construction method avoids the deviation caused by the mix proportion of the theory or the experience in the construction, saves the excessive consumption of the materials such as cement, and greatly guarantees the effective diffusion radius of grouting solution, the construction speed is fast, batch construction can be conducted after the process is determined, the process is easy and without the need for large-sized construction equipment, the restriction of the site condition is small, a plurality of stir zones of the grouting solution can be arranged, the construction time can be greatly shortened, the construction speed can be improved, and the construction cost can be reduced; the double sleeve valve pipe grouting construction method is suitable for deep foundation pit excavation construction of fractured soil layers with different types; and the slope stability of the deep foundation pit is greatly improved.

Description

technical field [0001] The invention relates to the technical field of grouting, in particular to the grouting construction of a double sleeve valve pipe. Background technique [0002] With the development of building foundation pits in the direction of "big and deep", the problems of deep foundation pit enclosure construction technology are becoming more and more prominent, especially the problem of groundwater control in foundation pit engineering in high water level areas is becoming more and more important. The French Soletancle foundation company invented the Soletan repair method in the 1950s. It is a relatively advanced grouting construction technology and has been widely used in civil engineering circles at home and abroad. A series of research and development was carried out and it was called the sleeve valve pipe grouting method. [0003] Aiming at the sleeve valve pipe grouting method, after many experiments, it was found that there are some problems in the simpl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D15/04E02D3/12
CPCE02D15/04E02D3/12
Inventor 苏春生
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP OF THE FIFTH ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products