Cutter arrangement method of tunnel groove precutting equipment
A technology of pre-cutting grooves and equipment, which is applied in the direction of tunnels, mining equipment, earthwork drilling and mining, etc., and can solve the problems of no index design method for measuring different layout methods, no research, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0067] The implementation process of the present invention will be described in detail in conjunction with the accompanying drawings. The present invention takes sandstone cutting by pre-grooving equipment as an example, and different geological parameters can be selected for different geological conditions. figure 1 The flow chart of the knife distribution method, first determine the cutting force of a single chain knife, the known conditions are as follows: ① Rock parameters: uniaxial compressive strength 20MPa; ② Cutting parameters: the cutting depth is selected as 6mm, the circumcision speed y 220mm / min, chain cutting speed v x It is 45000mm / min, and the groove width D is 172mm. figure 2 A model of chain knife cutting rock and soil is shown, the thickness d of the cutting knife 201 is 22 mm, the cutting angle is 81°, and the value of η is between 0.4 and 0.7.
[0068] The horizontal load of a single chain knife is calculated according to the chain knife cutting rock and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com