Construction method for preventing bridge foundation in mountain river from being scoured
A bridge foundation and construction method technology, applied in water conservancy projects, sea area projects, river regulation, etc., to achieve the effect of simple construction, cost reduction, and solution to erosion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further elaborated and illustrated below in conjunction with the accompanying drawings and specific embodiments. The technical features of the various implementations in the present invention can be combined accordingly on the premise that there is no conflict with each other.
[0023] Such as figure 1 As shown, for a bridge foundation in a mountainous river that has been eroded by erosion, the following reinforcement and prevention constructions are adopted for it:
[0024] (1) At the position 15m downstream of the bridge foundation, lay 1-2 rows of 10m-long prefabricated reinforced concrete piles, and drive 9m into the river bed as the fixed piles of the dam. The fixed piles are arranged along the cross section of the channel.
[0025] (2) Place 1m upstream or in the middle of the fixed pile (5-6m spacing) 3 Concrete prefabricated blocks (or block stones, fences) are 1m higher than the river bed to build a 1m high river dam. After a l...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com