[0028] Please refer to the attached figure 1 , A road construction method, the road construction method here is suitable for motor vehicle lanes and non-motor vehicle lanes.
[0029] Step a:
[0030] Clean up and level the road surface that needs to be paved, and fill it with pond slag to form the roadbed1.
[0031] Specifically, before filling the foundation of the road section, the current pile of soil, demolition of construction waste and the current cement pavement are all excavated, transported and removed, and the underlying weeds, tree roots, etc., the original ground weeds, tree roots, crop residues, and rot All soil, garbage, etc. must be removed; on this basis, the entire road section shall be cleared.
[0032] Step b:
[0033] The first pond slag treatment layer 2a and the second pond slag treatment layer 2b are sequentially laid on the top of the roadbed 1. The thickness of the first pond slag treatment layer 2a and the second pond slag treatment layer 2b are both 40 cm.
[...
Embodiment 2
[0050] Please refer to the attached figure 2 , A road construction method, the road construction method here is suitable for road construction methods at the intersection of sidewalks and non-motorized vehicle lanes.
[0051] Step a:
[0052] Clean up and level the road surface that needs to be paved, and form the first roadbed 111 for pond slag filling on the road where the non-motor vehicle lane is located; pave the first pond slag treatment layer 2a and the second pond slag treatment layer on the non-motor vehicle road 2b.
[0053] Specifically, before filling the foundation of the road section, the current pile of soil, demolition of construction waste and the current cement pavement are all excavated, transported and removed, and the underlying weeds, tree roots, etc., the original ground weeds, tree roots, crop residues, and rot All soil, garbage, etc. must be removed; on this basis, the entire road section shall be cleared.
[0054] The thickness of the first pond slag treat...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com