Parallel scheduling disassembly path forming method based on mixing fuzzy model
A path generation and fuzzy model technology, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve the problem that the processing time is not an accurate value, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0111] Embodiment 1 is a specific embodiment for step 3:
[0112] 1) Mixed coding of procedures and stations under disassembly requirements
[0113] For example, for the mixed coding of the dismantling process and work station, for example, the code of an individual is: 1, 3, 4, 2, 4, 1, 3, 2, 1, 4, 1, 2 | 2, 5, 3 , 3, 1, 4, 2, 5, 4, 2, 1, 5, the process and station information is shown in Table 4, which includes 4 parts and 5 stations. The correspondence table between parts and stations is shown in Table 5:
[0114] Table 4 Decomposition table of a mixed coding individual process and station information
[0115]
[0116] Table 5 Correspondence between parts and stations
[0117]
[0118] 2) Establish a fitness function according to the optimization objective, and assign an initial value to the fitness;
[0119] 3) Carry out selection operation, crossover operation and mutation operation on the population.
[0120] population selection
[0121] The roulette method ...
Embodiment 2
[0132] Embodiment 2 is specifically described in conjunction with the disassembly process of a certain type of hydraulic press, and the specific steps are as follows:
[0133] Step 1: Summarize the disassembly process of a certain type of hydraulic press. Explosion diagram of hydraulic press figure 2 , This type of hydraulic machine contains a total of 7 main structural components 1. Column; 2. Upper beam; 3. Oil cylinder; 4. Stamping slider; All disassembly processes are completed on 10 optional stations, and the disassembly process of each component is less than or equal to 6 steps.
[0134] Step 2: According to the historical data of a certain disassembly workshop, the list of optional stations corresponding to all parts disassembly processes is given, as shown in Table 6:
[0135] Table 6 Each process corresponds to an optional station
[0136]
[0137] Step 3, according to the historical data of the dismantling workshop, the triangular fuzzy number set of the disma...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com