Construction Method of Connecting Wall in Deep and Thick Bedrock

A construction method, ground connection wall technology, applied in the direction of foundation structure engineering, excavation, sheet pile wall, etc., can solve the problems of high-rise buildings, difficult construction, high strength, etc., to speed up the project progress, save relocation costs, The effect of ensuring the quality of the project

Active Publication Date: 2019-06-25
SINOHYDRO FOUND ENG
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the prior art, various situations and geological conditions are often encountered in building construction, such as the construction of deep and hard bedrock with a covering layer of several meters, a rock thickness of more than 20 meters, a rock hardness of up to 132 MPa, and a pipeline group whose width exceeds the diameter of the drill bit. Due to the extremely complex construction environment of the enclosure structure under such geological conditions, sometimes the ground connection wall project may be close to high-rise buildings, and the underground pipelines are dense, the anchor rods and anchor cables span across, and the wall passes through the hard bedrock with large thickness and high strength. Therefore, the construction is extremely difficult, and how to safely, efficiently, and high-quality complete the construction of the wall of the enclosure structure, how to implement the project construction smoothly, and ensure the construction period have become problems that need to be solved urgently by engineering experts.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction Method of Connecting Wall in Deep and Thick Bedrock
  • Construction Method of Connecting Wall in Deep and Thick Bedrock
  • Construction Method of Connecting Wall in Deep and Thick Bedrock

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0072] The present inventor is aimed at the comprehensive geological conditions of the overburden of several meters, the rock thickness exceeding 20 meters, the deep hard bedrock with high rock hardness (such as up to 132 MPa) and the ultra-wide pipeline whose width of the pipeline group exceeds the diameter of the drill bit. In order to solve the difficult problems in the construction of the ground connection wall, combined with the experience accumulated in the construction process for a long time, the construction method of the present invention that can solve the low construction efficiency and long construction period of the construction under the above geological conditions has been developed.

[0073] In the construction method of the deep bedrock ground connection wall provided by the present invention, when an ultra-wide pipeline that cannot be moved occurs during construction, the following method is used to perform trough-forming construction on the ground connection ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a concrete diaphragm wall of a deep bedrock. The construction method for the concrete diaphragm wall of the deep bedrock comprises the step that when an ultra-wide pipeline incapable of being moved or modified exists, trough-forming construction is conducted on the trough section of the concrete diaphragm wall below the ultra-wide pipeline, specially, pipeline protectors are arranged around the ultra-wide pipeline so that the ultra-wide pipeline can be protected in a surrounded mode; soil below the ultra-wide pipeline is excavated out by a long-boom excavator; the rest of soil or rock below the ultra-wide pipeline is drilled through a nonequilibrium drilling method so that a trough can be formed in the concrete diaphragm wall below the ultra-wide pipeline; and three steel reinforcement cages are arranged in the trough, and one of the three steel reinforcement cages can be located under the ultra-wide pipeline. According to the construction method, the ultra-wide pipeline does not need to be moved or modified, the moving and modification cost is omitted, and the project progress is accelerated; a frictional drill bit is adopted for drilling hard bedrock, especially large-dip-angle steep rock, jamming of the drill bit during pore-forming is controlled, and the drilling efficiency is improved; and an intra-trough slurry circulating method is applied in the drilling process, the construction efficiency in the environment of deep hard rock is improved, and the trough forming quality is ensured.

Description

technical field [0001] The invention relates to the technical field of civil construction engineering, in particular to a construction method for connecting walls with deep bedrock. Background technique [0002] In the prior art, various situations and geological conditions are often encountered in building construction, such as the construction of deep and hard bedrock with a covering layer of several meters, a rock thickness of more than 20 meters, a rock hardness of up to 132 MPa, and a pipeline group whose width exceeds the diameter of the drill bit. Due to the extremely complex construction environment of the enclosure structure under such geological conditions, sometimes the ground connection wall project may be close to high-rise buildings, and the underground pipelines are dense, the anchor rods and anchor cables span across, and the wall passes through the hard bedrock with large thickness and high strength. Therefore, the construction is extremely difficult, and ho...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/18E02D17/06E02D15/02E02D31/02E21B7/04E21B10/36E21B21/00
CPCE02D5/18E02D15/02E02D17/06E02D31/02E21B7/04E21B10/36E21B21/00
Inventor 胡斌夏洪华李国保李伟孙红涛赵瑞峰韩拥军季海元李明宇朱明宝郑伟程涛崔江伟朱永健
Owner SINOHYDRO FOUND ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products