Existing building exterior wall reconstruction structure and construction method

A technology for existing buildings and structural renovations, applied in building construction, construction, building maintenance, etc., can solve problems such as short-lived buildings, waste of resources within the design period, difficulty in upgrading and restoring original appearance of building walls, etc. Achieve the effects of reducing building energy consumption, maintaining urban cultural features, and shortening the construction period

Active Publication Date: 2018-05-04
BUCG THE EIGHTH CONSTR DEV
View PDF5 Cites 19 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide an existing building exterior wall reconstruction structure and construction method, to solve the technical problems of difficulty in upgrading and original appearance restoration of the existing building wall, the life of the building not reaching the design period, and the waste of resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Existing building exterior wall reconstruction structure and construction method
  • Existing building exterior wall reconstruction structure and construction method
  • Existing building exterior wall reconstruction structure and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0046] Such as Figure 1-6 As shown, this existing building exterior wall reconstruction structure is set on the outside of the existing building wall 5, and includes a new masonry wall 1, vertical steel bars 2, horizontal steel bars 3, and tie bars 4; The wall 1 is close to the outer side of the existing building wall 5 and is made of perforated bricks; among them, the holes of the upper and lower layers of perforated bricks of the new masonry wall 1 are arranged vertically correspondingly; the vertical steel bar 2 has one The group is arranged at intervals along the outer side of the existing building wall 5; wherein, each vertical steel bar 2 is installed in the hole of the perforated brick for a full length; the horizontal steel bar 3 has a group and is arranged at a vertical interval; wherein , Each horizontal steel bar 3 is arranged in the mortar joint of two adjacent layers of porous bricks, the two ends of the horizontal steel bar 3 are respectively fixedly connected wi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an existing building exterior wall reconstruction structure and a construction method. The existing building exterior wall reconstruction structure comprises a newly-built wallbody, vertical reinforcing steel bars, horizontal reinforcing steel bars and tie bars, wherein the newly-built wall body is tightly attached to the outer side face of an existing building wall body,and is built with porous bricks; pores of upper-layer porous bricks and lower-layer porous bricks of the newly-built wall body are vertically formed correspondingly; one group of horizontal reinforcing steel bars is arranged at intervals along the outer side face of the existing building wall body; the vertical reinforcing steel bars are inserted into the pores of the porous bricks in the full length; one group of horizontal reinforcing steel bars is arranged at intervals along a vertical direction; the horizontal reinforcing steel bars are arranged in mortar joints of two adjacent layers of porous bricks; the two ends of the horizontal reinforcing steel bars are fixedly connected with the vertical reinforcing steel bars on a corresponding side; the tie bars are horizontally arranged between the existing building wall body and the newly-built wall body. The existing building exterior wall reconstruction structure and the construction method provided by the invention have the advantagesthat the technical problems of difficulty in reconstructing and upgrading the existing wall body and recovering the original appearance, incapability of making the building reach designed service life and resource waste are solved.

Description

Technical field [0001] The invention belongs to the field of construction engineering, and particularly relates to an existing building exterior wall reconstruction structure and a construction method. Background technique [0002] With the continuous development of urban construction in my country, large-scale construction, development, and urban cultural inheritance and protection have always contradicted each other. Among them, the representative and larger ones are the ones from the 1970s to the 1990s. Old buildings, such as factory workshops, clubs, workshops, and some government commissions and bureaus, and other office buildings with masonry structure. These buildings are outdated in terms of function and comfort, and their appearance is also dilapidated, which cannot satisfy people’s desire for modern buildings. Claim. However, in view of the requirements for the preservation and inheritance of urban cultural features in the overall planning of the central city, some valua...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G23/02E04B1/41
CPCE04B1/4178E04G23/0222
Inventor 刘卫东张永健季旭
Owner BUCG THE EIGHTH CONSTR DEV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products