Construction method for assembly type prefabricated comprehensive pipe gallery

A technology of comprehensive pipe gallery and construction method, which is applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve the problems of high comprehensive cost, long construction period, and large space occupation, and achieve low comprehensive cost and short construction period Effect

Inactive Publication Date: 2016-06-01
青岛润国生态科技发展有限公司
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Whether the existing comprehensive pipe gallery is an integral comprehensive pipe gallery or an assembled comprehensive pipe gallery, it needs to be hoisted with large-scale hoisting equipment during installation, so it will take up a lot of space and have a great impact on road traffic. Some construction The construction site needs to build temporary roads, resulting in long construction period and high overall cost, but some construction sites, especially urban areas, do not have the conditions to build temporary roads

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for assembly type prefabricated comprehensive pipe gallery
  • Construction method for assembly type prefabricated comprehensive pipe gallery
  • Construction method for assembly type prefabricated comprehensive pipe gallery

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] In order to clearly illustrate the technical points of the present invention, the present invention will be described in detail below through specific implementation modes and in conjunction with the accompanying drawings.

[0025] see figure 1 Concrete cushion construction, positioning and setting out of prefabricated comprehensive pipe gallery.

[0026] see figure 2 All suitable lifting equipment such as tire cranes, crawler cranes, and gantry cranes will descend to the pipe gallery cushion through temporary roads.

[0027] see image 3 The bottom plate of the prefabricated prefabricated comprehensive pipe gallery is transported to the working range of the lifting equipment and the bottom plate of the prefabricated prefabricated comprehensive pipe gallery is installed in the first section.

[0028] see Figure 4 The lifting equipment is located on the prefabricated component of the prefabricated prefabricated integrated pipe gallery floor, and the prefabricated c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for an assembly type prefabricated comprehensive pipe gallery and belongs to the field of construction of assembly type prefabricated comprehensive pipe galleries. The construction method comprises the steps that pipe gallery locating paying off is conducted; hoisting equipment is placed in place; a first segment of pipe gallery bottom plate is installed; the hoisting equipment is placed on the installed bottom plate, and the next segment of pipe gallery bottom plate is installed; prefabricated pipe gallery component conveying equipment travels on the installed pipe gallery bottom plates and conveys needed components back and forth; according to the above steps, pipe gallery bottom plate prefabricated components of a construction section are all installed sequentially and circularly; and installation is started backwards from a segment of pipe gallery bottom plate finally installed in the construction section, side plates and top plate prefabricated components are installed sequentially until all pipe gallery components of the construction section are installed. According to the construction method, the installed pipe gallery bottom plates are adopted as a temporary conveying hoisting passage, and a temporary road does not need to be built, so that the construction period is short, the comprehensive cost is low, and the construction method is particularly suitable for construction sites without conditions for building temporary roads in urban districts.

Description

technical field [0001] The invention relates to a construction method of an assembled prefabricated comprehensive pipe gallery, in particular to a construction method in which the hoisting equipment of the assembled prefabricated comprehensive pipe gallery uses the bottom plate of the pipe gallery as a passage. Background technique [0002] The comprehensive pipe gallery is to build an underground pipe gallery under the municipal road, which will gather and lay municipal pipelines such as drainage, heat, gas, electricity, communication, radio and television, etc., and set up special inspection ports, feeding ports and other facilities for unified construction Management, eliminating the need for independent structures and earthwork excavation of the pipeline itself, can effectively and intensively use space resources. Its advantages are: one-time excavation, centralized construction, avoiding repeated excavation of the same road section; it greatly facilitates the maintenanc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D29/05
CPCE02D29/10
Inventor 仝利
Owner 青岛润国生态科技发展有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products