Traction-type tool derrick rig for replacing derricks of steel tube truss-concrete arch bridge
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A steel tube truss and concrete technology, applied in arch bridges, bridge forms, erection/assembly of bridges, etc., can solve the problems of high engineering work intensity, high construction cost, complicated construction procedures, etc., and achieve fast construction installation and dismantling. The effect of low strength and convenient standardized construction
Active Publication Date: 2016-02-03
LIUZHOU OVM ENG
View PDF7 Cites 3 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
Disadvantages: high engineering work intensity, difficult control of on-site welding quality, easy damage to the arch ribs and coating of the original steel pipe, wedge-shaped blocks cannot be used repeatedly, slow progress in demolition and restoration work, large-scale lifting equipment consumes a lot of shifts, and the construction cost is high
[0003] The application publication number is: CN102926332A, and the name of the invention is "tool hanger device and replacement method for steel arch bridge hanger replacement" which discloses a tool hanger device for steel arch bridge hanger replacement. Weld the limit device near the location of each suspender replacement. It is difficult to control the welding quality on site. It will damage the arch rib and coating of the original steel structure. The material of the limit device cannot be used for turnover. After the suspender is replaced, local welding on the surface of the steel structure is required. The position of the site is repaired; the number of wire ropes around the arch circle is large, the construction process is complicated, the engineering work intensity is high, the progress of demolition and restoration work is slow, the consumption of large lifting equipment is large, and the construction cost is high
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0023] The utility model relates to a traction tool hanger device for replacing the hanger of a steel pipe truss concrete arch bridge.
[0024] Such as figure 1 , figure 2 As shown, the traction tool boom device for replacing the boom of the steel pipe truss concrete arch bridge includes a fixed end anchor, a tension end anchor 5, an upper conversion beam 18, a temporary boom 16 and a hanging device, namely: the lower Joist 20;
[0025] The difference from the existing tool hanger device is that the traction tool hanger device for replacing the hanger rod of the steel pipe truss concrete arch bridge of the present invention also includes a traction type vault anchorage anti-skid system installed on the arch of the steel pipe truss concrete arch bridge , the traction vault anchorage anti-skid system is composed of a sling 1, an anchor beam 2, a traction cable 3, a traction jack 9, a sliding shoe 12, a skateboard 11, a walking mechanism 10, a leveling mechanism 8, a beam 6 an...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
PUM
Login to view more
Abstract
The invention discloses a traction-type tool derrick rig for replacing derricks of a steel tube truss-concrete arch bridge. The traction-type tool derrick rig comprises fixed end anchorage devices, tensioning end anchorage devices, upper conversion beams, temporary derricks, a sling device, and a traction-type arch crown anchorage and anti-slide system composed of hanging belts, anchorage beams, traction ropes, traction jacks, slide shoes, slide plates, travelling mechanisms, levelling mechanisms, cross beams and adjustable screws, wherein one end of each of one hanging belt and one traction rope is anchored at the two sides of the corresponding anchorage beam, the other end of each traction rope is connected with the corresponding traction jack through the corresponding travelling mechanism, the other end of each hanging belt is fixed on a web member, the slide shoes are installed at the bottom of each travelling mechanism, and connected with the travelling mechanism through arc-shaped hinged supports; and one levelling mechanism is located above each travelling mechanism, each adjustable screw penetrates through the corresponding levelling mechanism and the corresponding travelling mechanism, and each adjustable screw, the corresponding levelling mechanism and the corresponding travelling mechanism are connected through pin shafts. According to the device, during a rope force conversion process for derrick replacement, the stress system of the original structure is not changed, the influence on a stress of the original structure is low, the labour working intensity is low, standardized construction is facilitated, the working efficiency is high, and the construction cost is low.
Description
technical field [0001] The invention relates to a bridge construction machine tool, in particular to a tool suspender device for replacing the suspender of a steel tube truss concrete arch bridge. Background technique [0002] At present, most of the steel tube truss concrete arch bridge suspender replacement cable force conversion devices are mainly temporary suspenders or temporary hoisting devices, and the upper part of the arch needs to be fixed by welding to level the wedge or anti-slip stoppers to achieve the leveling of the arch and facilitate installation. Beam or anti-slip purposes. When the temporary boom or the temporary hoisting device needs to be transferred to the next boom replacement place, the arched beam needs to be hoisted by large-scale lifting equipment. Disadvantages: high engineering work intensity, difficult control of on-site welding quality, easy damage to the arch ribs and coating of the original steel pipe, wedge-shaped blocks cannot be used repe...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.