Network province two-stage multi-power short-period coordination peak shaving method
A multi-power supply and peak-shaving technology, applied in data processing applications, forecasting, instruments, etc., can solve problems such as not being able to meet the needs of two-level dispatching and operation of the network and the province
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The grid-province two-level multi-power supply coordination aims to use the large grid platform to optimize the allocation of high-quality resources among multiple grids to alleviate the huge peak-shaving pressure of my country's grid. This problem is different from the previous single-provincial grid peak-shaving problem. The power demand and power station and unit operation control constraints need to deal with the coordinated optimization of multiple types of power sources and multiple power grids. It is essentially a very complex large-scale nonlinear multi-objective optimization problem, and the modeling and solution are very difficult. How to deal with load differences among multiple provincial power grids, how to make use of the operating characteristics of different types of power sources, and coordinate and meet the peak-shaving requirements of multiple power grids are the main difficulties in solving the problem. The present invention discloses a method for shor...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com