Quick construction method of tunnels traversing unfavorable geology
A construction method and poor technology, used in tunnels, tunnel linings, underground chambers, etc., can solve the problems of many processes and affect the construction period, and achieve the effect of less joints, ensuring construction progress, and good waterproof effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0019] In order to make the objects and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0020] This specific implementation provides a kind of rapid construction method for tunnel crossing bad geology, comprising the following steps:
[0021] S1. Carry out pre-construction karst survey and geological survey, and select a suitable layered and block excavation plan to facilitate the stability of the excavated surrounding rock;
[0022] S2, using methods such as advanced pipe shed or advanced grouting to carry out advanced reinforcement of the formation;
[0023] S3. Use controlled blasting or pre-splitting blasting to break the hole, dig the main hole inward along the hole, carry out support treatment for the main hole, strengthen t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com