Blasting construction method for freezing shaft and unstable rock stratum
A construction method and technology of freezing wells, which are applied in blasting and other directions, can solve problems such as blasting construction methods in unstable rock formations, slow driving speed, and long drilling and blasting time, so as to improve the regular circulation rate, save material costs, and increase the number of blast holes. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0020] The blasting construction method for freezing shafts and unstable rock formations is characterized in that the process steps are:
[0021] Drilling, that is, drilling according to the blasthole depth and diameter set according to the requirements of the blasting process;
[0022] Lower the pipe, install a PVC pipe matching the diameter of the blasthole in the blasthole; immediately lower the pipe after drilling.
[0023] Charging, filling the PVC pipe with explosives and detonators;
[0024] Wiring, connect the detonator detonating wire with the power supply;
[0025] Blast off; connect the detonating power supply to blast.
[0026] The PVC pipe has an inner diameter of Ф47.3mm, an outer diameter of Ф50mm, and a length equal to the blasthole depth plus 200mm to 300mm.
PUM
Property | Measurement | Unit |
---|---|---|
The inside diameter of | aaaaa | aaaaa |
Outer diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com